My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 5/16/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction Company 5/16/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2025 11:04:07 AM
Creation date
5/16/2025 9:53:49 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
5/16/2025
Council Approval Date
5/7/2025
Department
Public Works
Department Project Manager
Dan Erico
Subject / Project Title
2025 PAVEMENT MAINTENANCE OVERLAY
Public Works WO Number
COE PW WO# 3830
Tracking Number
0004830
Total Compensation
$1,327,733.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Granite Construction Company 8/25/2025 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Washington State Department of Labor and Industries Policy Statements (Regarding Production and Delivery of Gravel, Concrete, Asphalt, etc.) <br />WAC 296-127-018 Agency filings affecting this section <br />Coverage and exemptions of workers involved in the production and delivery of <br />gravel, concrete, asphalt, or similar materials. <br />(1)The materials covered under this section include but are not limited to: Sand, gravel, <br />crushed rock, concrete, asphalt, or other similar materials. <br />(2) All workers, regardless of by whom employed, are subject to the provisions of <br />chapter 39.12 RCW when they perform any or all of the following functions: <br />(a)They deliver or discharge any of the above-listed materials to a public works project <br />site: <br />(i) At one or more point(s) directly upon the location where the material will be <br />incorporated into the project; or <br />(ii)At multiple points at the project; or <br />(iii)Adjacent to the location and coordinated with the incorporation of those materials. <br />(b)They wait at or near a public works project site to perform any tasks subject to this <br />section of the rule. <br />(c)They remove any materials from a public works construction site pursuant to <br />contract requirements or specifications (e.g., excavated materials, materials from <br />demolished structures, clean-up materials, etc.). <br />(d) They work in a materials production facility (e.g., batch plant, borrow pit, rock quarry, <br />etc.,) which is established for a public works project for the specific, but not necessarily <br />exclusive, purpose of supplying materials for the project. <br />(e) They deliver concrete to a public works site regardless of the method of <br />incorporation. <br />(f) They assist or participate in the incorporation of any materials into the public works <br />project. <br />Supplemental to Wage Rates 10 <br />3/5/2025 Edition, Published February 11, 2024
The URL can be used to link to this page
Your browser does not support the video tag.