My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 5/16/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction Company 5/16/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2025 11:04:07 AM
Creation date
5/16/2025 9:53:49 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
5/16/2025
Council Approval Date
5/7/2025
Department
Public Works
Department Project Manager
Dan Erico
Subject / Project Title
2025 PAVEMENT MAINTENANCE OVERLAY
Public Works WO Number
COE PW WO# 3830
Tracking Number
0004830
Total Compensation
$1,327,733.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Granite Construction Company 8/25/2025 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Power Equipment <br />Operators <br />Barrier Machine (zipper)$88.22 1 5 J 1 1 G 8 X <br />Power Equipment <br />Operators <br />Batch Plant Operator: <br />concrete <br />$88.22 1 5 J 1 1 G 8 X <br />Power Equipment <br />Operators <br />Boat Operator $87.82 7 A 1 1 H 8 X <br />Power Equipment <br />Operators <br />Bobcat $83.69 1 5 J 1 1 G 8 X <br />Power Equipment <br />Operators <br />Brokk - Remote <br />Demolition Equipment <br />$83.69 1 5 J 1 1 G 8 X <br />Power Equipment <br />Operators <br />Brooms $83.69 1 5 J 1 1 G 8 X <br />Power Equipment <br />Operators <br />Bump Cutter $88.22 1 5 J 1 1 G 8 X <br />Power Equipment <br />Operators <br />Cableways $89.02 1 5 J 1 1 G 8 X <br />Power Equipment <br />Operators <br />Chipper $88.22 1 5 J 1 1 G 8 X <br />Power Equipment <br />Operators <br />Compressor $83.69 1 5 J 1 1 G 8 X <br />Power Equipment <br />Operators <br />Concrete Finish Machine - <br />Laser Screed <br />$83.69 1 5 J 1 1 G 8 X <br />Power Equipment <br />Operators <br />Concrete Pump - Mounted <br />Or Trailer High Pressure <br />Line Pump, Pump High <br />Pressure <br />$87.54 1 5 J 1 1 G 8 X <br />3/21/25, 2:45 PM Journey Level Wages <br />https://secure.lni.wa.gov/wagelookup/rates/journey-level-rates 19/47
The URL can be used to link to this page
Your browser does not support the video tag.