My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 5/16/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction Company 5/16/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2025 11:04:07 AM
Creation date
5/16/2025 9:53:49 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
5/16/2025
Council Approval Date
5/7/2025
Department
Public Works
Department Project Manager
Dan Erico
Subject / Project Title
2025 PAVEMENT MAINTENANCE OVERLAY
Public Works WO Number
COE PW WO# 3830
Tracking Number
0004830
Total Compensation
$1,327,733.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Granite Construction Company 8/25/2025 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Power Equipment <br />Operators- Underground <br />Sewer & Water <br />Material Transfer Device $88.22 1 5 J 1 1 G 8 X <br />Power Equipment <br />Operators- Underground <br />Sewer & Water <br />Mechanics: All (Leadmen - <br />$0.50 per hour over <br />mechanic) <br />$89.91 1 5 J 1 1 G 8 X <br />Power Equipment <br />Operators- Underground <br />Sewer & Water <br />Motor Patrol Graders $89.02 1 5 J 1 1 G 8 X <br />Power Equipment <br />Operators- Underground <br />Sewer & Water <br />Mucking Machine, Mole, <br />Tunnel Drill, Boring, Road <br />Header And/or Shield <br />$89.02 1 5 J 1 1 G 8 X <br />Power Equipment <br />Operators- Underground <br />Sewer & Water <br />Oil Distributors, Blower <br />Distribution & Mulch <br />Seeding Operator <br />$83.69 1 5 J 1 1 G 8 X <br />Power Equipment <br />Operators- Underground <br />Sewer & Water <br />Outside Hoists (Elevators <br />and Manlifts), Air Tuggers, <br />Strato <br />$87.54 1 5 J 1 1 G 8 X <br />Power Equipment <br />Operators- Underground <br />Sewer & Water <br />Overhead, bridge type <br />Crane: 20 tons through 44 <br />tons <br />$87.03 7 A 1 1 H 8 X <br />Power Equipment <br />Operators- Underground <br />Sewer & Water <br />Overhead, bridge type: <br />100 tons and over <br />$88.67 7 A 1 1 H 8 X <br />Power Equipment <br />Operators- Underground <br />Sewer & Water <br />Overhead, bridge type: 45 <br />tons through 99 tons <br />$87.82 7 A 1 1 H 8 X <br />3/21/25, 2:45 PM Journey Level Wages <br />https://secure.lni.wa.gov/wagelookup/rates/journey-level-rates 34/47
The URL can be used to link to this page
Your browser does not support the video tag.