My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 5/16/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction Company 5/16/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2025 11:04:07 AM
Creation date
5/16/2025 9:53:49 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
5/16/2025
Council Approval Date
5/7/2025
Department
Public Works
Department Project Manager
Dan Erico
Subject / Project Title
2025 PAVEMENT MAINTENANCE OVERLAY
Public Works WO Number
COE PW WO# 3830
Tracking Number
0004830
Total Compensation
$1,327,733.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Granite Construction Company 8/25/2025 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Telephone Line <br />Construction - Outside <br />Hole Digger/Ground <br />Person <br />$27.31 5 A 2 B <br />Telephone Line <br />Construction - Outside <br />Telephone Equipment <br />Operator (Light) <br />$34.53 5 A 2 B <br />Telephone Line <br />Construction - Outside <br />Telephone Lineperson $39.07 5 A 2 B <br />Terrazzo Workers Journey Level $67.51 7 E 1 N <br />Tile Setters Journey Level $65.51 7 E 1 N <br />Tile, Marble & Terrazzo <br />Finishers <br />Finisher $56.34 7 E 1 N <br />Tra c Control Stripers <br />All cleanup required in <br />connection with tra c <br />control stripers work <br />(Group 1) <br />$92.44 1 5 L 1 K <br />Tra c Control Stripers <br />Handling, painting and <br />installing of all car stops, <br />stop signs and any other <br />type sign (Group 2) <br />$62.69 1 5 L 1 K <br />Tra c Control Stripers <br />Installation of guard rail <br />and posts and similar <br />protective devices (Group <br />2) <br />$62.69 1 5 L 1 K <br />Tra c Control Stripers Installation of parking <br />gates, ticket spitters and <br />other mechanical and <br />$62.69 1 5 L 1 K <br />3/21/25, 2:45 PM Journey Level Wages <br />https://secure.lni.wa.gov/wagelookup/rates/journey-level-rates 45/47
The URL can be used to link to this page
Your browser does not support the video tag.