Laserfiche WebLink
Telephone Line <br />Construction - Outside <br />Hole Digger/Ground <br />Person <br />$27.31 5 A 2 B <br />Telephone Line <br />Construction - Outside <br />Telephone Equipment <br />Operator (Light) <br />$34.53 5 A 2 B <br />Telephone Line <br />Construction - Outside <br />Telephone Lineperson $39.07 5 A 2 B <br />Terrazzo Workers Journey Level $67.51 7 E 1 N <br />Tile Setters Journey Level $65.51 7 E 1 N <br />Tile, Marble & Terrazzo <br />Finishers <br />Finisher $56.34 7 E 1 N <br />Trac Control Stripers <br />All cleanup required in <br />connection with trac <br />control stripers work <br />(Group 1) <br />$92.44 1 5 L 1 K <br />Trac Control Stripers <br />Handling, painting and <br />installing of all car stops, <br />stop signs and any other <br />type sign (Group 2) <br />$62.69 1 5 L 1 K <br />Trac Control Stripers <br />Installation of guard rail <br />and posts and similar <br />protective devices (Group <br />2) <br />$62.69 1 5 L 1 K <br />Trac Control Stripers Installation of parking <br />gates, ticket spitters and <br />other mechanical and <br />$62.69 1 5 L 1 K <br />3/21/25, 2:45 PM Journey Level Wages <br />https://secure.lni.wa.gov/wagelookup/rates/journey-level-rates 45/47