Granite Construction Company 5/16/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction Company 5/16/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2025 11:04:07 AM
Creation date
5/16/2025 9:53:49 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
5/16/2025
Council Approval Date
5/7/2025
Department
Public Works
Department Project Manager
Dan Erico
Subject / Project Title
2025 PAVEMENT MAINTENANCE OVERLAY
Public Works WO Number
COE PW WO# 3830
Tracking Number
0004830
Total Compensation
$1,327,733.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Granite Construction Company 8/25/2025 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2025 PAVEMENT MAINTENANCE OVERLAY SPECIAL PROVISIONS <br />PW# 3830 <br /> SP-12 March 26, 2025 <br /> <br />1-05.GR1 1 <br />Control of Work 2 <br /> 3 <br />1-05.1.GR1 4 <br />Authority of the Engineer 5 <br /> 6 <br />1-05.1(2).GR1 7 <br />Requests for Information (RFI) 8 <br /> 9 <br />1-05.1(2).INST1.GR1 10 <br />The fourth paragraph of Section 1-05.1(2) is revised to read: 11 <br /> 12 <br />1-05.1(2).OPT1.2026.GR1 13 <br />(November 4, 2024) 14 <br />The Contractor may submit a RFI for one of the following reasons: 15 <br /> 16 <br />1. The Contractor believes there is information missing from the Contract 17 <br />Documents (Missing Information). 18 <br /> 19 <br />2. The Contractor believes a clarification of one or more of the Contract 20 <br />requirements is necessary (Clarification). 21 <br /> 22 <br />3. The Contractor needs to substitute a material that provides an equal or 23 <br />better level of performance as the one specified in the Contract (RFC - 24 <br />Material Substitution). Requests shall indicate the location(s), quantity, and 25 <br />shall describe how the material provides an equal or better level of 26 <br />performance as the material originally specified. 27 <br /> 28 <br />4. The Contractor requests a change to the Contract requirements for a 29 <br />reason other than one listed in items 1-3 of this Section (RFC - Other). To 30 <br />be considered, the request must not meet the requirements of a Value 31 <br />Engineering Change Proposal. To be considered, the request shall qualify 32 <br />as a Minor Change in accordance with Section 1-04.4(1) and shall describe 33 <br />how the change is beneficial to the project. 34 <br /> 35 <br />1-05.7.RTF 36 <br />1-05.7 Removal of Defective and Unauthorized Work 37 <br />(October 1, 2005 APWA GSP) 38 <br /> 39 <br />Supplement this section with the following: 40 <br /> 41 <br />If the Contractor fails to remedy defective or unauthorized work within the time specified 42 <br />in a written notice from the Engineer, or fails to perform any part of the work required by 43 <br />the Contract Documents, the Engineer may correct and remedy such work as may be 44 <br />identified in the written notice, with Contracting Agency forces or by such other means as 45 <br />the Contracting Agency may deem necessary. 46 <br /> 47 <br />If the Contractor fails to comply with a written order to remedy what the Engineer 48 <br />determines to be an emergency situation, the Engineer may have the defective and 49 <br />unauthorized work corrected immediately, have the rejected work removed and replaced, 50 <br />or have work the Contractor refuses to perform completed by using Contracting Agency 51 <br />or other forces. An emergency situation is any situation when, in the opinion of the 52