My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 5/16/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction Company 5/16/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2025 11:04:07 AM
Creation date
5/16/2025 9:53:49 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
5/16/2025
Council Approval Date
5/7/2025
Department
Public Works
Department Project Manager
Dan Erico
Subject / Project Title
2025 PAVEMENT MAINTENANCE OVERLAY
Public Works WO Number
COE PW WO# 3830
Tracking Number
0004830
Total Compensation
$1,327,733.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Granite Construction Company 8/25/2025 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2025 PAVEMENT MAINTENANCE OVERLAY SPECIAL PROVISIONS <br />PW# 3830 <br /> SP-15 March 26, 2025 <br /> <br /> 1 <br />Operational and test periods, when required by the Engineer, shall not affect a 2 <br />manufacturer’s guaranties or warranties furnished under the terms of the contract. 3 <br /> 4 <br /> 5 <br />1-05.13.RTF 6 <br />1-05.13 Superintendents, Labor, and Equipment of Contractor 7 <br />(August 14, 2013 APWA GSP) 8 <br /> 9 <br />Delete the sixth and seventh paragraphs of this section. 10 <br /> 11 <br />1-05.14.GR1 12 <br />Cooperation with Other Contractors 13 <br /> 14 <br />1-05.14.INST1.GR1 15 <br />Section 1-05.14 is supplemented with the following: 16 <br /> 17 <br />1-05.16.RTF 18 <br />Add the following new section: 19 <br /> 20 <br />1-05.16 Water and Power 21 <br />(October 1, 2005 APWA GSP) 22 <br /> 23 <br />The Contractor shall make necessary arrangements, and shall bear the costs for power 24 <br />and water necessary for the performance of the work, unless the contract includes power 25 <br />and water as a pay item. 26 <br /> 27 <br />1-06.GR1 28 <br />Control of Material 29 <br /> 30 <br />1-06.6.RTF 31 <br />1-06.6 Recycled Materials 32 <br />(January 4, 2016 APWA GSP) 33 <br /> 34 <br />Delete this section, including its subsections, and replace it with the following: 35 <br /> 36 <br />The Contractor shall make their best effort to utilize recycled materials in the construction 37 <br />of the project. Approval of such material use shall be as detailed elsewhere in the 38 <br />Standard Specifications. 39 <br /> 40 <br />Prior to Physical Completion the Contractor shall report the quantity of recycled materials 41 <br />that were utilized in the construction of the project for each of the items listed in Section 42 <br />9-03.21. The report shall include hot mix asphalt, recycled concrete aggregate, recycled 43 <br />glass, steel furnace slag and other recycled materials (e.g. utilization of on-site material 44 <br />and aggregates from concrete returned to the supplier). The Contractor’s report shall be 45 <br />provided on DOT form 350-075 Recycled Materials Reporting. 46 <br /> 47 <br />1-07.GR1 48 <br />Legal Relations and Responsibilities to the Public 49 <br /> 50
The URL can be used to link to this page
Your browser does not support the video tag.