My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 5/16/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction Company 5/16/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2025 11:04:07 AM
Creation date
5/16/2025 9:53:49 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
5/16/2025
Council Approval Date
5/7/2025
Department
Public Works
Department Project Manager
Dan Erico
Subject / Project Title
2025 PAVEMENT MAINTENANCE OVERLAY
Public Works WO Number
COE PW WO# 3830
Tracking Number
0004830
Total Compensation
$1,327,733.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Granite Construction Company 8/25/2025 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2025 PAVEMENT MAINTENANCE OVERLAY SPECIAL PROVISIONS <br />PW# 3830 <br /> SP-47 March 26, 2025 <br /> <br />chemical additives and foaming processes. The use of Additives is subject to the 1 <br />following: 2 <br /> 3 <br />· Do not use additives that reduce the mixing temperature more than allowed in 4 <br />Section 5-04.3(6) in the production of mixtures. 5 <br />· Before using additives, obtain the Engineer’s approval using WSDOT Form 350-6 <br />076 to describe the proposed additive and process. 7 <br /> 8 <br />5-04.3 Construction Requirements 9 <br /> 10 <br />5-04.3(1) Weather Limitations 11 <br />Do not place HMA for wearing course on any Traveled Way beginning October 1st 12 <br />through March 31st of the following year without written concurrence from the Engineer. 13 <br /> 14 <br />Do not place HMA on any wet surface, or when the average surface temperatures are 15 <br />less than those specified below, or when weather conditions otherwise prevent the 16 <br />proper handling or finishing of the HMA. 17 <br /> 18 <br />Minimum Surface Temperature for Paving 19 <br />Compacted Thickness <br />(Feet) Wearing Course Other Courses <br />Less than 0.10 55°F 45°F <br />0.10 to .20 45°F 35°F <br />More than 0.20 35°F 35°F <br /> 20 <br />5-04.3(2) Paving Under Traffic 21 <br />When the Roadway being paved is open to traffic, the requirements of this Section 22 <br />shall apply. 23 <br /> 24 <br />The Contractor shall keep intersections open to traffic at all times except when paving 25 <br />the intersection or paving across the intersection. During such time, and provided that 26 <br />there has been an advance warning to the public, the intersection may be closed for the 27 <br />minimum time required to place and compact the mixture. In hot weather, the Engineer 28 <br />may require the application of water to the pavement to accelerate the finish rolling of the 29 <br />pavement and to shorten the time required before reopening to traffic. 30 <br /> 31 <br />Before closing an intersection, advance warning signs shall be placed, and signs shall 32 <br />also be placed marking the detour or alternate route. 33 <br /> 34 <br />During paving operations, temporary pavement markings shall be maintained throughout 35 <br />the project. Temporary pavement markings shall be installed on the Roadway prior to 36 <br />opening to traffic. Temporary pavement markings shall be in accordance with Section 8-37 <br />23. 38
The URL can be used to link to this page
Your browser does not support the video tag.