My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group 6/1/2016
>
Contracts
>
Capital Contract
>
American Process Group 6/1/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2016 11:16:41 AM
Creation date
6/15/2016 9:49:01 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group
Approval Date
6/1/2016
Council Approval Date
4/6/2016
Department
Public Works
Department Project Manager
Chris Chesson
Subject / Project Title
2016 Biosolids Removal
Public Works WO Number
2600-4-1
Tracking Number
0000138
Total Compensation
$553,065.98
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
American Process Group Inc Change Order 1 8/30/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SUBCONTRACTORS <br /> 1. List the names of the subcontractors with whom the bidder will subcontract if awarded the contract. <br /> Bidder may name itself any or all of the work, including one or more categories of work. <br /> 2. For heating, ventilation, air conditioning, plumbing (as defined by RCW Chap. 18.106) and <br /> electrical work (as defined by RCW Chap. 19.28), Bidder MUST either identify itself or <br /> subcontractors. If Bidder believes such work is not part of the scope of work, Bidder shall <br /> write "NO WORK". <br /> �. For all other types and scope of work, the City will assume the bidder will perform with its own <br /> forces any and all types and scope of work for which a subcontractor is not identified. <br /> 4. Bidder shall not list more than one subcontractor for each category of work identified, unless <br /> subcontractors vary with bid alternates, in which case the bidder must indicate which subcontractor <br /> will be used for which alternate. <br /> 5. Bidder's bid shall be deemed nonresponsive and void if: <br /> A. (For heating, ventilation, air conditioning, plumbing and electrical work) Bidder fails to <br /> submit as part of the bid the names of such subcontractors or to name itself to perform such <br /> work or writes "No Work"; or <br /> B. Bidder names two or more subcontractors to perform the same work. <br /> 6. The requirement to name the bidder's proposed heating, ventilation and air conditioning, plumbing, <br /> and electrical subcontractors applies only to proposed heating, ventilation and air conditioning, <br /> plumbing, and electrical subcontractors who will contract directly with the general contractor <br /> submitting the bid to the City. <br /> Type/Scope of Work Name and Address of Subcontractor/Or Bidder <br /> I!EATING <br /> Subcontractor,bidder or"no work" MUST he <br /> stated No work <br /> VENTILATION AND AIR CONDITIONING <br /> Subcontractor, bidder or"no work" MUST be <br /> stated No work <br /> PLUMBING (as described in RCW Chap. 18.106) <br /> Subcontractor,bidder or"no work" MUST be <br /> stated No work <br /> ELEC7R.ICAI., (as described in RCW Chap. 19.28) <br /> Subcontractor, bidder or "no work" MUST be <br /> stated No work <br /> 2016 Biosolids Removal DIVISION P.P-6 December I.2015 <br /> WORK ORDER.4 2600-4-1 <br /> Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scale <br />
The URL can be used to link to this page
Your browser does not support the video tag.