My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WA ST Military Dept 4/7/2025 Amendment 1
>
Contracts
>
Agreement
>
Grant Agreement (City as Grantee)
>
WA ST Military Dept 4/7/2025 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2025 10:22:35 AM
Creation date
5/16/2025 10:05:59 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
WA ST Military Dept
Approval Date
4/7/2025
Council Approval Date
4/16/2025
End Date
4/30/2026
Department
Public Works
Department Project Manager
Shaun Bridge
Subject / Project Title
Evergreen Pump Station Permanent Generator
Public Works WO Number
D22-024
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0003456
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Grant Agreement (City as Grantee)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Attachment 3 <br />STATEMENT OF WORK AND/OR DESCRIPTION OF PROJECT <br />S UBRECIPIENT: The City of Everett <br />P ROJECT TITLE City of Everett Permanent Generator <br />The purpose of this project is for the City of Everett to purchase a backup generator for continuity of operation <br />of the Evergreen Pump Station (47.9433 -122 2156). The project is located on the Reservoir 3 property, on the <br />east side of Evergreen Way, between Madison St. and 52nd St. NE <br />The activities include 1. Electrical design and construction, 2 Establish a 600 square foot concrete pad, 3. <br />P urchase and installation of a generator that will operate 2 of the 5 City of Everett Evergreen Pump Stations, 4. <br />P urchase and install a small sound attenuating structure to house the generator. <br />Environmental Conditions of Approval: <br />This review does not address all Federal, State, and local requirements. Acceptance of Federal <br />funding requires recipient to comply with all Federal, State, and local laws. Failure to obtain all <br />appropriate Federal, State, and local environmental permits and clearances may jeopardize Federal <br />funding. <br />Any change to the approved Scope of Work will require re-evaluation for compliance with the National <br />Environmental Policy Act and other laws and Executive Orders. <br />If ground disturbing activities occur during construction, applicant will monitor ground disturbance and if <br />any potential archaeological resources are discovered, will immediately cease construction in that area <br />and notify the State and Federal Emergency Management Agency. <br />A specific and more detailed scope of work is found in the FEMA approved Project Application 5320-23, which <br />is incorporated herein by reference. <br />The City of Everett Agrees To: <br />1. Comply with the terms of this Agreement and all Attachments, including but not limited to, accomplish tasks <br />and conditions outlined in the Statement of Work And/Or Description of Project (Attachment 3), comply with <br />the Project Development Schedule -Attachment 4 and comply with the Project Budget (Attachment 5). <br />2 Submit quarterly reports that cover the previous three months no later than the 15th of the following month <br />(or the next work day) in January, April, July and October until all requirements are fulfilled. Quarterly reports <br />are required regardless of the level of work completed during the reporting period. Quarterly reports must <br />include sufficient narrative to determine the degree to which the project has been implemented, the estimated <br />time for completion, and significant developments such as delays or adverse conditions that might raise costs <br />or delay completion, as well as favorable conditions allowing lower costs or earlier completion Failure of the <br />S UBRECIPIENT to submit a complete quarterly report within 15 days following the end of the quarter will <br />result in suspension of all payments until a complete quarterly report is received by the DEPARTMENT. <br />S UBRECIPIENT is required to return all final closeout documentation to the DEPARTMENT within 45 days <br />following the Period of Performance End Date determined by FEMA's Notice of Award The DEPARTMENT <br />reserves the right to withhold the final reimbursement request until final closeout documentation is submitted <br />by the SUBRECIPIENT to the satisfaction of the DEPARTMENT. No final reimbursements shall be paid if <br />submitted more than 60 days after the Period of Performance End Date. <br />3. Submit pen -and -ink signed, approved invoice vouchers (state form A-19) for eligible, reimbursable work <br />completed, no more frequently than monthly and no less frequently than quarterly. Each billing must identify <br />the task(s) completed and any other funding identification pertinent to the task(s), including match. <br />S upporting documentation is required for all costs, to include tracking of staff time spent on the project <br />through timesheets or other documentation approved by the DEPARTMENT; dated invoices from all <br />contractors and subcontractors for work completed, dated invoices for goods and services purchased; and <br />documentation tracking in -kind contributions of personnel equipment and supplies, if used on the project. <br />P roject costs must be tracked and reported by approved budget cost categories as found in Project Budget, <br />Attachment 5 Documentation of expenditures by approved budget cost categories should be made on a <br />separate spreadsheet or table and included with each A-19, along with documentation to substantiate all <br />project costs. <br />Mitigation Project Grant Agreement REV 8/8/23 Page 24 of 30 City of Everett, D25-042-Revised <br />
The URL can be used to link to this page
Your browser does not support the video tag.