Laserfiche WebLink
<br /> <br />UKG Statement of Work for City of Everett <br />This Statement of Work (SOW) outlines the scope of services to be provided by UKG for the Professional Service(s) in the corresponding <br />Order and is subject to the terms and conditions set forth in the UKG Master Services Agreement (MSA) or such other existing <br />underlying agreement between Parties. The scope of services described herein are time and materials and fixed price based and <br />subject to the same terms and conditions as the corresponding Order. Unless otherwise defined herein, words and expressions defined <br />in the Order shall have the same meaning in this Statement of Work. In the event of a conflict or discrepancy between the terms in <br />this SOW and the MSA, the MSA shall prevail. <br /> <br />1. Professional Services in Scope <br />The Customer has engaged UKG to provide the following Professional Services: <br /> <br />Service Description <br />Migration to Telestaff <br />Cloud (fixed fee) <br />UKG will: <br />x Conversion of UKG TeleStaff in the Kronos Private Cloud to UKG TeleStaff Cloud in the Google Cloud <br />Platform. <br />o Google Cloud Platform environments: (1) Production and (1) Development (Non- <br />Production). <br />x Professional Services Scope: <br />o Project management sufficient to organize UKG project resources. <br />o Project Kickoff Call. <br />o System Overview Call. <br />o Testing Support. <br />o Go Live Support. <br /> <br />2. Service Parameters <br />The following parameters provide an additional set of considerations as it applies to the Project and Professional Services <br />described in this document: <br /> <br />Item Parameters <br />Project Assumptions <br />x The target duration for this project is 8-10 working weeks. <br />x Solution Assumptions: <br />o Conversion to UKG TeleStaff Cloud does not include customizations (outside of the scope <br />listed above), configuration, new features, or functionality other than what is required by the <br />new version. <br />Scope Changes and <br />Pricing <br />• Any stated project duration is for guidance only and expected to be as set out in this SOW based <br />ƵƉŽŶh<'͛ƐĞdžƉĞƌŝĞŶĐĞǁŝƚŚh<'ĐƵƐƚŽŵĞƌƐĂŶĚථƐŽůƵƚŝŽŶƐ͘Scope changes are subject to review and <br />may impact the project duration and cost. If additional work beyond the initial scope of this SOW is <br />needed, a separate Service Request will be required. <br />• If the Customer requires services not specified in this SOW, those services will be scoped based upon <br />complexity and billed at the then current rate. <br />• UKG will not be responsible for troubleshooting Subscription Service(s), interfaces or hardware not <br />provided by UKG. <br />• UKG’s quoted pricing does not include the Excluded Items set out in this SOW. <br /> <br />Page 4