Laserfiche WebLink
2024 System Development Fee Calculations <br />Permit #: PW2404-054 <br />Additional Notes: <br />Project Address: 9540 Holly Dr. (Lot 6) <br />Project Name: Perez Short Plat <br />Answer the Following Questions (Required): All Yellow Inputs <br />Water District: I Everett <br />Sewer District: IlMukilteo <br />Prepared By: Abiy Tsegaye Date: 4/26/2024 <br />Outside City Limits? INo *Adds a 25%Surcharge <br />Supportive Housing Credit? INo *Reduces by 80% <br />Reviewed By: Thad Newport Date: 4/26/2024 <br />Fee Calculations: <br />Water & Sewer System Development Fees: <br />Domestic Meter: Fee Calculation (Before Credit): <br />Credit Calculations (Up to 3 meters for Meter -Based Calculation or 3 previous building uses for Administrative Guidelines -Based Calculation): <br />*subject to administrative Guidelines Proposed Building Use: SFR/Townhome Previous Bldg Use #1: No Other Use Previous Bldg Use #2: <br />No Other Use <br />Previous Bldg Use #3: <br />No Other Use <br />ProposeclUnit Measure: <br />Unit Unit Measure for Use #1: - None Unit Measure for Use #2: <br />None <br />Unit Measure for Use #3: <br />None <br />Note: Meter Size Used for Calculation Proposed Meter Size: <br />1" Credited Meter #1 Size: None Credited Meter #2 Size: <br />None <br />Credited Meter #3 Size: <br />None <br />Water Fee: <br />$7,644.00 Water Credit #1: $0.00 Water Credit #2: <br />$0.00 <br />Water Credit #3: <br />$0.00 <br />Sewer Fee: <br />$0.00 Sewer Credit #1: $0.00 Sewer Credit #2: <br />$0.00 <br />Sewer Credit #3: <br />$0.00 <br />Total Fees Due. Add to Utility Permit for Domestic Meter <br />Permit #: U Water Sys Dev Fee Total: <br />$7,644.00 <br />This fee reflects creditfor existing water meter <br />Sewer Sys Dev Fee Total: <br />$0.00 <br />No fee due to different sewerjurisdiction <br />Total: <br />$7,644.00 <br />Irrigation Meter: Fee Calculation (Before Credit): <br />Credit Calculations: <br />Proposed Meter Size: <br />None Credited Meter Size: None <br />Water Fee: <br />$0.00 Water Credit: $0.00 <br />No Sewer Fee: <br />$0.00 No Sewer Credit: $0.00 <br />Total Fees Due: Add to Utility Permit far Irrigation Meter <br />Permit #: U Water Sys Dev Fee Total: <br />$0.00 <br />This fee reflects creditfor existing water meter <br />No Sewer Sys Dev Fee: <br />$0.00 <br />lirrigation meters are only subject to the water portion of system development fees <br />Total: <br />$0.00 <br />Fire Meter: Proposed Meter Size: <br />None <br />For informational purposes only <br />Permit #: U No Sys Dev Fees: <br />$0.00 <br />Fire meters are not subject to system developmentfees <br />Stormwater System Development Fees: <br />Permit #: _B2310-114_ Type of Construction: Existing Development Adding New + Replaced Hard Surfaces <br />Square Feet of New Plus Replaced Hard Surfaces: <br />- SF <br />Stormwater System Dev Fee: <br />$0.00 Add this fee to the Building Permit <br />Permit #: _PW2404-054 Type of Construction: New Construction/Redevelopment <br />Square Feet of New Plus Replaced Hard Surfaces: <br />2,186 SF <br />Stormwater System Dev Fee: <br />$747.00 Add this fee to the Public Works Permit <br />