My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025/05/28 Council Agenda Packet
>
Council Agenda Packets
>
2025
>
2025/05/28 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2025 4:47:17 PM
Creation date
5/28/2025 4:39:21 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
5/28/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
391
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />14 <br /> <br />Performance targets <br />5. List your jurisdiction’s CTR performance target(s).5 <br />a. List performance targets that reflect only CTR-affected worksites. <br />Weighted average drive-alone rate of 60 percent or less for CTR-affected worksites at the <br />jurisdictional level. <br />b. List any additional performance targets. <br /> <br />None. <br /> <br />6. List the base value you’ll use for each performance target.6 <br />a. For each performance target, provide the number you’ll use as the baseline (or starting <br />number). You’ll measure the difference between this number and your results to report <br />performance. <br />Performance targets will be tied to the CTR survey. We will establish a base value during the <br />2023-2025 survey cycle and measure progress using 2025-2027 survey results. <br /> <br />7. Describe the method you used to determine the base value for each target. <br />a. Provide the source for each base value listed. <br />Performance targets will be tied to the CTR survey. We will establish a base value during the <br />2023-2025 survey cycle and measure progress using 2025-2027 survey results. <br /> <br />8. Describe how you’ll measure progress toward each target. <br />a. List the method you’ll use to measure progress for each target. <br />We will measure progress using the 2025-2027 survey results. <br /> <br /> <br />5 Source: The plan shall establish the jurisdiction's CTR goals and targets. (WAC 468-63-040(2)(b)) <br />6 Source: The plan's measurement methodology shall be consistent with the measurement guidelines established by WSDOT and posted on the agency's <br />website. (WAC 468-63-040(2)(c))
The URL can be used to link to this page
Your browser does not support the video tag.