Laserfiche WebLink
<br />14 <br /> <br />Performance targets <br />5. List your jurisdiction’s CTR performance target(s).5 <br />a. List performance targets that reflect only CTR-affected worksites. <br />Weighted average drive-alone rate of 60 percent or less for CTR-affected worksites at the <br />jurisdictional level. <br />b. List any additional performance targets. <br /> <br />None. <br /> <br />6. List the base value you’ll use for each performance target.6 <br />a. For each performance target, provide the number you’ll use as the baseline (or starting <br />number). You’ll measure the difference between this number and your results to report <br />performance. <br />Performance targets will be tied to the CTR survey. We will establish a base value during the <br />2023-2025 survey cycle and measure progress using 2025-2027 survey results. <br /> <br />7. Describe the method you used to determine the base value for each target. <br />a. Provide the source for each base value listed. <br />Performance targets will be tied to the CTR survey. We will establish a base value during the <br />2023-2025 survey cycle and measure progress using 2025-2027 survey results. <br /> <br />8. Describe how you’ll measure progress toward each target. <br />a. List the method you’ll use to measure progress for each target. <br />We will measure progress using the 2025-2027 survey results. <br /> <br /> <br />5 Source: The plan shall establish the jurisdiction's CTR goals and targets. (WAC 468-63-040(2)(b)) <br />6 Source: The plan's measurement methodology shall be consistent with the measurement guidelines established by WSDOT and posted on the agency's <br />website. (WAC 468-63-040(2)(c))