My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Krazan & Associates, Inc. 5/28/2025
>
Contracts
>
6 Years Then Destroy
>
2025
>
Krazan & Associates, Inc. 5/28/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2025 12:32:50 PM
Creation date
5/29/2025 12:32:11 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Krazan & Associates, Inc.
Approval Date
5/28/2025
End Date
7/31/2025
Department
Parks & Community Services
Department Project Manager
Lisa Page
Subject / Project Title
Hazardous Material Testing for Lead & Asbestos for Cedar Hall, within Forest Park
Tracking Number
0004845
Total Compensation
$4,000.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
EXHIBIT A <br />PROFESSIONAL SERVICES AGREEMENT <br />SCOPE OF WORK <br />DESCRIPTION QUANTITY UNIT PRICE TOTAL <br />Admin <br />Project Manager 2.0 hrs $135.00/hr $270.00 <br />Project Amin 1.0 hrs $75.00/hr $75.00 <br />$340.00 <br />Labor and Report, per hour <br />Senior Environmental Professional Review 1.0 hrs $190.00/hr $190.00 <br />AHERA Certified Building Inspector Report Writing 8.0 hrs $120.00/hr $960.00 <br />$1,150.00 <br />Laboratory Testing, each <br />Bulk Asbestos 35 samples $22.00/sample $770.00 <br />Lead Paint 5 samples $35.00/sample $175.00 <br />$945.00 <br />Field Exploration <br />AHERA Certified Building Inspector 8.0 hrs $120/hr $960.00 <br />Trip Charge (26 miles round-trip) 1 $31.00 $31.00 <br />Equipment/Consumable Fee 1 $45.00 $45.00 <br />$1,036.00 <br />Total Estimated Cost $3,476.00 <br />Contingency Fee (If Necessary): <br />Additional Services that may be needed based upon any issues that surface during testing as approved ONLY in <br />writing by the authorized City Representative. <br />Total Contingency Fee $524.00 <br />Total Maximum Compensation: <br />Project Cost $3,476.00 <br />Contingency Fee $524.00 <br />$4,000.00 <br />This proposal for the work identified above is considered fixed-fee cost proposal based upon estimated labor and <br />expenses required to complete the scope of work described herein. Krazan reserves the right, with prior approval <br />by City of Everett, to adjust the estimated service fees for significant changes in the level of effort that may be <br />required to complete the designated tasks. Significant changes in the scope of work will be charged at the current <br />fees from our mutually agreed fee schedule referenced in the above table. <br />Krazan anticipates that the limited hazmat sampling and survey will be prepared and submitted under one cover. <br />In addition, Krazan understands that access to the subject site and areas of sample collection locations will be <br />arranged by City of Everett, and that the charges listed above assume that only one trip to the subject site is <br />required. The proposed services and associated fees of this proposal do not include costs associated with hazard <br />abatement project design, construction/demolition project contract document preparation, hazard abatement <br />project management, air monitoring services normally required on construction/demolition projects involving <br />hazardous materials, and additional hazardous materials surveys that may be required based on future renovation <br />and/or demolition. <br />Exhibit A (Scope of Work)
The URL can be used to link to this page
Your browser does not support the video tag.