City of Everett 00 52 13 <br />Later Phase Eclipse Mill Park WO# 383921 <br />1 <br />CONTRACT <br />THIS CONTRACT is made and entered by and between the City of Everett, Washington, <br />a municipal corporation existing under the laws of the State of Washington (the “City”) and <br />Strider Construction Co., Inc, (the “Contractor”). <br />In consideration of the sums to be paid to it by the City, Contractor hereby covenants <br />and agrees to furnish all labor, tools, materials, equipment, and supplies required to complete in <br />a workmanlike manner the work, improvements, and appurtenances in accordance with the <br />Specifications and Drawings and all other Contract Documents entitled: “Later Phase Eclipse <br />Mill Park”, (the “Project”). <br />1.Contract Documents. The “Contract Documents” are defined in the General <br />Conditions. The Contract Documents are part of this Contract and are hereby incorporated by <br />reference. Terms that are capitalized in a Contract Document but not defined in that Contract <br />Document shall have the meaning defined to them in the other Contract Documents. A copy of <br />the Contract Documents that were posted for the Project on Builder’s Exchange of Washington <br />(www.bxwa.com) as of Bid Opening Date is maintained by the City Clerk’s Office as a single pdf <br />and is available as follows: <br />Link to PDF https://lfportal.everettwa.gov/WebLink/DocView.aspx?id=1893203&searchid=f241caae- <br />0568-4d35-b106-2596d9573710&dbid=0 <br />This is a 659-page PDF digitally signed by City of Everett 2025.05.20 09:21:38-7’00’ <br />Contractor acknowledges that Contractor has downloaded and reviewed this pdf prior to signing <br />this Contract. City and Contractor agree that this pdf contains all posted Contract Documents <br />as of the Bid Opening Date. City and Contractor further agree that this pdf may contain some <br />other documents (such as Reference Information) that are not Contract Documents. <br />2.Contract Time. Substantial Completion of the Work shall be achieved within Two <br />hundred forty-seven (247) calendar days after the effective date of the Notice to Proceed. <br />Physical Completion shall be within Ninety (90) calendar days after the actual date of issuance <br />of Substantial Completion. <br />3.Liquidated Damages. The parties agree the City will suffer damage and be put to <br />additional expense in the event that the Contractor does not complete the Work in all respects <br />and have it ready for use by the Substantial and Physical Completion dates stated above. <br />Because it is difficult to accurately compute the amount of such costs and damages, the <br />Contractor hereby covenants and agrees to pay to the City liquidated damages for each and <br />every calendar day (or working day, if Contract Time is described in working days) in the <br />amounts set forth in this Section. For failure to achieve Substantial Completion by the <br />Substantial Completion date stated above, the Contractor shall pay liquidated damages to the <br />City computed at the daily rate of fifteen percent (15%) of the Contract Sum divided by the <br />number of days of Contract Time stated above. Once Substantial Completion is achieved, for <br />failure to achieve Physical Completion by the Physical Completion Date stated above, the