My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Strider Construction Company, Inc. 5/27/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Strider Construction Company, Inc. 5/27/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2025 1:27:47 PM
Creation date
5/29/2025 1:26:50 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Strider Construction Company, Inc.
Approval Date
5/27/2025
Council Approval Date
5/14/2025
End Date
12/31/2026
Department
Parks & Community Services
Department Project Manager
Katherine Phillips
Subject / Project Title
Later Phase Eclipse Mill Park
Tracking Number
0004831
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 52 13 <br />Later Phase Eclipse Mill Park WO# 383921 <br />4 <br />against the City, its agents or employees, the Contractor, a subcontractor, anyone directly or <br />indirectly employed by the Contractor or subcontractor, or anyone for whose acts any of them <br />may be liable, the defense and indemnification obligations hereunder shall not be limited in any <br />way by any limitation on the amount of damages, compensation, or benefits payable by or for <br />the Contractor or any subcontractor under industrial worker’s compensation acts, disability <br />benefit acts, or other employees’ benefit acts. Contractor’s and City’s signatures hereto indicate <br />specific waiver of Contractor’s industrial insurance immunity in order to fulfill the indemnities <br />hereunder. Solely for the purpose of indemnification and defense as provided in this Contract, <br />the Contractor specifically waives any immunity under the State Industrial Insurance Law, Title <br />51 RCW. The Contractor expressly acknowledges that this waiver of immunity under Title 51 <br />RCW was the subject of mutual negotiation and was specifically entered into pursuant to the <br />provisions of RCW 4.24.115. <br />11.Repair of Damage. The Contractor agrees to repair and replace all property of the <br />City and all property of others damaged by it, its employees, subcontractors, suppliers and <br />agents. <br />12.Pre-Bid Inspection and Risk of Loss. It is understood that the whole of the work <br />under this contract is to be done at the Contractor’s risk and that: (1) prior to submitting its <br />proposal or bid, it became familiar with the conditions of excavation, subsurface, backfill, <br />materials, climatic conditions, location, traffic, and other contingencies that may affect the work <br />and has made its bid or proposal accordingly and (2) that it assumes the responsibility and risk <br />of all loss or damage to materials or work that may arise from any cause whatsoever prior to <br />completion. <br />13.Headings for Convenience Only. The headings in this document are for <br />convenience only, and shall not be used or considered to interpret or construe this document. <br />14.Effective Date/Counterparts/Signature. This Contract is effective as of the date of <br />the last person to sign it, and may be executed in multiple counterparts, each of which shall be <br />deemed an original. This Contract may be signed with AdobeSign, and any such signature is <br />fully binding. <br />[Remainder of Page Intentionally Left Blank]
The URL can be used to link to this page
Your browser does not support the video tag.