Laserfiche WebLink
T ,.888.25,5276 <br /> Bellingham I Arlington I Oak Harbor <br /> (eor www.geotest-inc.com <br /> ADHESIVE ANCHOR INSPECTION REPORT <br /> PROJECT: ZAP Energy Bank A Shielding JOB M 24-4077 <br /> CLIENT: Trico Companies REPORT M AA001 <br /> CONTRACTOR: Trico Companies PAGE M 2 of 2 <br /> Image 1. A photo <br /> during the initial <br /> discharge of epoxy to - <br /> verify proper mixing. <br /> 2,V <br /> 1,s � <br /> V 6., <br /> Image 2. A photo of <br /> the hold-down anchors <br /> installed at Gridline <br /> H/4. <br /> r <br /> i <br /> ., a <br />