My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5901 23RD DR W ZAP ENERGY 2025-08-04
>
Address Records
>
23RD DR W
>
5901
>
ZAP ENERGY
>
5901 23RD DR W ZAP ENERGY 2025-08-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2025 11:31:43 AM
Creation date
5/30/2025 8:11:21 AM
Metadata
Fields
Template:
Address Document
Street Name
23RD DR W
Street Number
5901
Tenant Name
ZAP ENERGY
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: B2410-026 Description:Adding Walls and Ceilings To Existing Structure <br /> Applied: 10/10/2024 Approved: 12/9/2024 Site Address: 5901 23RD DR W SUITE 100 <br /> Issued: 12/10/2024 Finaled: City,State Zip Code: EVERETT,WA 98203 <br /> Status: PERMIT ISSUED-ONLINE Applicant:Charity MacDowell <br /> Parent Permit: Owner:SEAWAY CORPORATE LOT 3C <br /> Parent Project: Contractor:TRICO COMPANIES LLC <br /> Details: <br /> Adding a neutron shield walls and ceilings. Fire sprinkler and HVAC permit will be submitted separately. <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 12/20/2024 12/20/2024 BLDG 01- Matt Schreifels CANCELLED see notes <br /> CONSULTATION <br /> Notes: <br /> 12/18/2024 2:30 PM Will Eickhoff <br /> AM only Before 11AM <br /> Contact Name:Ray Potter <br /> Site Address:5901 23RD DR W SUITE 100 <br /> Phone:3609821539 <br /> e-Mail:jordanmeehan@tricocompanies.com <br /> Rescheduled inspection for Monday December 23rd 2024.AM inspection requested. <br /> 12/23/2024 12/23/2024 BLDG 08-FRAMING I RAKEEB KHAN PARTIAL <br /> APPROVAL <br /> Notes: <br /> RAYMOND POTTER <br /> RAYPOTTE R @TR I CO CO M PA N I ES.CO M <br /> Walls only.Contractor to get special inspection report on holdowns.No electrical in walls.Ok to cover after special inspection.Reschedule for shear and <br /> floor/ceiling framing. <br /> 12/27/2024 12/27/2024 BLDG 08-FRAMING RAKEEB KHAN PARTIAL eTRAKiT Inspection Request <br /> APPROVAL <br /> Notes: <br /> 12/26/2024 10:28 AM Will Eickhoff <br /> Before noon lab space <br /> Contact Name:Ray Potter <br /> Site Address:5901 23RD DR W SUITE 100 <br /> Phone:3609821539 <br /> e-Mail:raypotter@tricocompanies.com <br /> Epoxied holdowns.Contractor to finish installing holdown brackets.See special inspection report for epoxied holdowns.Ok to cover walls only. <br /> I <br /> Printed:Thursday,23 January, 2025 1 of 3 rk <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.