My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9001 AIRPORT RD BLDG 1 2025-10-21
>
Address Records
>
AIRPORT RD
>
9001
>
9001 AIRPORT RD BLDG 1 2025-10-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2025 2:25:39 PM
Creation date
5/30/2025 8:11:24 AM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
9001
Unit
BLDG 1
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
429
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SNO-ISLE TECH 2O23 SMALL WORKS Section 00 20 00, Page 5 <br />MCGRANAHAN ARCHITECTS INSTRUCTIONS TO BIDDERS <br />1.17 DISCREPANCIES <br />Should a bidder find discrepancies in, or omission from, the drawings or specifications, or be in doubt as to their meaning, <br />the bidder should at once notify the [Owner or Architect], who will send a written instruction to all bidders in the form of an <br />addendum. Neither the Owner nor the Architect will be responsible for any oral instructions. Questions received less than <br />72 hours before bids close cannot be answered. All addenda issued during the time of bidding will be numbered consecutively <br />and will be incorporated into the contract. It is the Contractor's responsibility to be sure that it has checked all addenda. <br />1.18 PLANS AND SPECIFICATIONS <br />Free -of -charge access to project bid documents (plans, specifications, addenda, and Bidders List) is provided to Prime <br />Bidders, Subcontractors, and Vendors by going to www.bxwa.com and clicking on "Posted Projects", "Public Works", and <br />"Mukilteo School District". This online plan room provides Bidders with fully usable online documents with the ability to: <br />download, view, print, order full/partial plan sets from numerous reprographic sources, and a free online digitizer/take-off <br />tool. It is recommended that Bidders "Register" in order to receive automatic e-mail notification of future addenda and to <br />i <br />place themselves on the "Self -Registered Bidders List". Bidders that do not register will not be automatically notified of <br />addenda and will need to periodically check the on-line plan room for addenda issued on this project. Contact Builders <br />Exchange of Washington at (425) 258-1303 should you require assistance with access or registration. <br />1.19 NON -MANDATORY PRE -BID CONFERENCE <br />A Non -Mandatory Pre -Bid Conference will be held at SNO-ISLE TECH SKILLS CENTER, 9001 Airport Road, Everett, <br />WA 98204 Thursday March 9th, 2023 at 2:00 pm, to answer any questions and review the scope of the work and the <br />documents. Attendees will be asked to sign in on the attendance sheet. <br />1.20 FORFEITURE OF BID GUARANTEE <br />Should the successful bidder fail to enter into the Contract and furnish the required Performance Bond and Payment Bond <br />and insurance documents within ten (10) days after issuance of Notice of Intent to Award Contract, its bid guarantee will be <br />�r forfeited to the Owner as liquidated damages, but not a penalty. <br />1.21 ALTERNATE BIDS AND UNIT PRICES (IF APPLICABLE) <br />If applicable in the plans and specifications, Contractor shall, at the time of submitting base bids, submit bids on alternates <br />and/or unit prices on the Form of Bid. Alternate bids and unit prices, other than those provided in the Contract Documents, <br />cannot be considered. Failure to bid upon all items called for may cause rejection of bid as irregular and/or nonresponsive. <br />1.22 REVIEW OF CONTRACT DOCUMENTS <br />The Contractor shall carefully study and compare the Contract Documents and shall report any error, inconsistency or <br />omission for instructions by the Architect per Paragraph 1.18 herein. If instructions are issued after the bid this will result in <br />the more costly solution being utilized, with no change in the bid price. <br />mcg-ARC 2120.000 February 28, 2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.