SNO-ISLE TECH 2O23 SMALL WORKS <br />McGRANAHAN ARCHITECTS <br />Section 00 30 00, Page 2 <br />BID FORM <br />C. STATE & LOCAL SALES TAX: The above submitted prices do not include State or Local Sales Tax but <br />do include all the other applicable taxes. <br />D. OVERHEAD & PROFIT: The Undersigned agrees that the submitted bid(s) includes all of Contractor's <br />overhead and profit or fees. <br />E. REINSTATEMENT OF ALTERNATES: The Undersigned agrees that the Owner has the right to reinstate, <br />at the Bid Price, any alternate bid not initially incorporated into the Contract, if the Owner notifies the <br />Undersigned within fifteen (15) days after the initial official Notice to Proceed with Work is issued. <br />F. TIME OF COMPLETION: The Undersigned hereby agrees to commence work under this Contract on or <br />before a date specified to be written in a "Notice to Proceed," to substantially and finally complete the Work <br />within the time specified in the Contract Documents. <br />G. TIME IS OF THE ESSENCE: Time is of the essence for all work to be performed under this Contract. <br />Contractors shall note that the Work must be completed within the time limit stated in the Contract <br />Documents. <br />H. LIQUIDATED DAMAGES: Failure to timely complete this contract will result in liquidated damages <br />pursuant to the Contract Documents. <br />I. CONTRACT & BOND(S): If written Notice of Award is issued to the Undersigned within thirty (30) days <br />after the date of opening of the bids, or at any time thereafter prior to the bid being withdrawn by the <br />Undersigned, the Undersigned agrees to execute and deliver a contract in the form required by the Contract <br />Documents and in accordance with the bid as accepted, with partial payments provided for in accordance <br />with the Contract Documents and the laws of the State of Washington relating to such payments for Public <br />Works (Chapter 60.28 RCW); and to provide the Performance and Payment Bond and required insurance <br />documents as specified in the Contract Documents with good and sufficient insurers, surety or sureties <br />acceptable to the Owner, within ten (10) days after issuance of the Notice of Award, exclusive of the day of <br />notice. <br />J. BID GUARANTEE: The Undersigned further agrees that the postal money order, certified or bank cashier's <br />check, or surety bond (collectively "Bid Guarantee") payable to the Owner, accompanying this proposal, is <br />left in escrow with the Owner; that its amount is the measure of liquidated damages which the Owner will <br />sustain by the failure of the Undersigned to execute and deliver the above -named Contract and Bond, and <br />that if the Undersigned defaults in executing and delivering that Contract and in providing the Bond and <br />insurance documents within ten (10) days of issuance of Notice of Award, then the Bid Guarantee shall be <br />forfeited to the Owner; but if this bid is not conditionally accepted by the Owner within thirty (30) days of <br />the time set for the opening of bids, or if the Undersigned executes and delivers said Contract, insurance <br />documents and Bond, the Bid Guarantee shall be returned to the Undersigned. <br />K. ADDENDA: Receipt of addenda numbered through is hereby acknowledged. <br />L. SUBCONTRACTOR LISTS: For those projects where the Owner's estimate of the cost of the work is one <br />million dollars or more, the Contractor shall submit the following in a manner consistent with the <br />requirements of RCW 39.30.360: <br />1. Within one hour after the published bid submittal time, the names of the subcontractors with whom the <br />bidder, if awarded the contract, will subcontract for performance of the work of: HVAC (heating, <br />mcg-ARC 2120.000 February 28, 2023 <br />