My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9001 AIRPORT RD BLDG 1 2025-10-21
>
Address Records
>
AIRPORT RD
>
9001
>
9001 AIRPORT RD BLDG 1 2025-10-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2025 2:25:39 PM
Creation date
5/30/2025 8:11:24 AM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
9001
Unit
BLDG 1
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
429
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SNO-ISLE TECH 2O23 SMALL WORKS Section 00 50 00, Page 2 <br />McGRANAHAN ARCHITECTS AGREEMENT BETWEEN OWNER <br />AND CONTRACTOR <br />ARTICLE 2 <br />THE WORK OF THIS CONTRACT <br />The Contractor shall fully execute the Work described in the Contract Documents, except to the extent <br />specifically indicated in the Contract Documents to be the responsibility of others. <br />ARTICLE 3 <br />DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION <br />3.1 The date of commencement of the Work shall be fixed in a notice to proceed issued by the Owner. <br />3.2 The Contract Time shall be measured from the date of commencement. <br />3.3 The Contractor shall achieve Substantial Completion of the entire Work not later than August 6, <br />2021, subject to adjustments of the Contract Time as provided in the Contract Documents. See <br />Subparagraph 8.2.3 of the General Conditions concerning liquidated damages. <br />ARTICLE 4 <br />CONTRACT SUM <br />4.1 The Owner shall pay the Contractor the Contract Sum in current funds for the Contractor's <br />performance of the Contract. The Contract Sum shall be Dollars <br />($ ), subject to additions and deductions as provided in the Contract <br />Documents. The Contract Sum will be increased by $1,000 if Contractor achieves the <br />apprenticeship utilization goals stated in Specification Section [insert section number] of the <br />Contract Documents, and the Contract Sum will be decreased by $1,000 if Contractor fails to <br />achieve said apprenticeship utilization goals. <br />4.2 The Contract Sum is based upon the following alternates, if any, which are described in the <br />Contract Documents and are hereby accepted by the Owner: <br />4.3 Unit prices, if any, are as follows: <br />mcg-ARC 2120.000 February 28, 2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.