Laserfiche WebLink
SNO-ISLE TECH 2O23 SMALL WORKS Section 00 70 00, Page 3 <br />McGRANAHAN ARCHITECTS GENERAL CONDITIONS <br />ARTICLE 11 <br />INSURANCE AND BONDS................................................................................. <br />56 <br />11.1 <br />CONTRACTOR'S LIABILITY INSURANCE ................................................... <br />56 <br />11.2 <br />OWNER'S LIABILITY INSURANCE.............................................................. <br />59 <br />J <br />.11.3 <br />PROPERTY INSURANCE .................................................................................. <br />59 <br />`= <br />11.4 <br />PERFORMANCE AND PAYMENT BONDS <br />60 <br />ARTICLE 12 <br />UNCOVERING AND CORRECTION OF WORK .............................................. <br />60 <br />12.1 <br />UNCOVERING OF WORK................................................................................. <br />60 <br />12.2 <br />WARRANTIES AND CORRECTION OF WORK ............................................. <br />61 <br />12.3 <br />ACCEPTANCE OF NONCONFORMING WORK ............................................ <br />62 <br />ARTICLE 13 <br />MISCELLANEOUS PROVISIONS...................................................................... <br />62 <br />13.1 <br />GOVERNING LAW............................................................................................. <br />62 <br />13.2 <br />SUCCESSORS AND ASSIGNS.......................................................................... <br />62 <br />13.3 <br />13.4 <br />WRITTEN NOTICE............................................................................................. <br />RIGHTS AND REMEDIES................................................................................. <br />62 <br />63 <br />13.5 <br />TESTS AND INSPECTIONS............................................................................... <br />63 <br />13.6 <br />INTEREST............................................................................................................ <br />64 <br />13.7 <br />PARTNERING <br />ARTICLE 14 <br />TERMINATION OR SUSPENSION OF THE CONTRACT ............................... <br />65 <br />14.1 <br />TERMINATION BY THE CONTRACTOR <br />65 <br />_+ <br />14.2 <br />TERMINATION BY THE OWNER FOR CAUSE ............................................. <br />65 <br />14.3 <br />TERMINATION OR SUSPENSION BY THE OWNER FOR CONVENIENCE66 <br />14.4 <br />CONTRACTOR'S DUTIES ON TERMINATION ............................................. <br />67 <br />GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION <br />ARTICLE 1 <br />GENERAL PROVISIONS <br />1.1 BASIC DEFINITIONS <br />1.1.1 THE CONTRACT DOCUMENTS <br />The Contract Documents consist of the Agreement between Owner and Contractor (hereinafter the <br />Agreement), Conditions of the Contract (General, Supplementary and other Conditions), Drawings, <br />Specifications, addenda issued prior to execution of the Contract, other documents listed in the <br />Agreement and modifications issued after execution of the Contract. A modification is (1) a written <br />amendment to the Contract signed by both parties, (2) a Change Order, (3) a Construction Change <br />Directive or (4) a written order for a minor change in the Work issued by the Architect subject to the <br />requirements of Paragraph 7.4. Unless specifically enumerated in the Agreement, the Contract <br />Documents do not include other documents such as bidding requirements (advertisement or invitation to <br />bid, Instructions to Bidders, sample forms, meeting minutes, the Contractor's bid or portions of addenda <br />relating to bidding requirements). <br />mcg-ARC 2120.000 February 28, 2023 <br />