SNO-ISLE TECH 2O23 SMALL WORKS Section 00 70 00, Page 18 <br />McGRANAHAN ARCHITECTS GENERAL CONDITIONS <br />safety person, or other jobsite personnel if the Owner determines that such replacement is in the best <br />interests of the Project. The Owner shall exercise such right in a reasonable manner. The Owner shall <br />be entitled to exercise the same rights concerning any replacement. <br />3.11 CONTRACTOR'S CONSTRUCTION SCHEDULES <br />3.11.1 The Contractor, within ten (10) days of being awarded the contract, shall prepare and submit for <br />the Owner's and Architect's information a Contractor's time -scaled, cost and resource loaded (to include <br />manpower, materials, and equipment) critical path method ("CPM") construction schedule for the Work. <br />The initial and any revisions of the Project Schedule shall be submitted to the Owner and Architect in <br />both a paper copy and an electronic data format using a computer program approved in advance by the <br />Owner. The schedule shall not exceed time limits current under the Contract Documents and shall be: <br />(i) updated monthly to show progress; (ii) revised at appropriate intervals as required by the conditions <br />of the Work and Project; (iii) related to the entire Project, including work to be performed by others such <br />as utilities and Owner's Subcontractors and inspectors; and (iv) provide for expeditious and practicable <br />execution of the Work. The Contractor may list for its convenience milestone dates in addition to dates <br />of completion specified in the contract documents. However, such milestone dates shall be labeled "For <br />Contractor's Information Only." Review by the Owner or Architect of the Contractor's Progress <br />Schedule shall not constitute approval or acceptance of the Contractor's schedules, means, methods, <br />sequencing, or milestone dates or Contractor's ability to complete the Work in a timely manner. Owner <br />shall not process Contractor's second pay application until the baseline CPM construction schedule is <br />submitted and approved in writing by Owner. <br />3.11.2 The Contractor shall prepare and keep current, for the Architect's approval, a schedule of <br />submittals which is coordinated with the Contractor's construction schedule and allows the Architect <br />reasonable time for appropriate review. <br />3.11.3 The Contractor shall perform its work according to the schedule it submits to the Owner and shall <br />conform its Work to the Contractor's most recent schedule. The schedule shall not indicate more than <br />one critical path. Float time indicated in the Contractor's schedule shall be for the joint use and benefit <br />of the Owner and Contractor. <br />3.11.4 The Contractor shall prepare a Schedule of Values, which is coordinated with the Contractor's <br />construction schedule. The Schedule of Values serves to break down the Contract Sum in sufficient <br />detail to facilitate continued evaluation of payment requests and progress reports. The Schedule of <br />Values shall indicate at least 5% shall be earned through performance of Contract closeout and punchlist <br />activities. The Contractor shall earn said amounts only when said tasks are fully completed; no payments <br />shall be earned for partial completion of said tasks. Said 5% is for closeout and punchlist activities and <br />is distinct and different from statutory retainage. Demolition shall be indicated separately. Line items <br />shall correspond with categories required by the Owner, which shall at least include the divisions of <br />work listed in the table of contents in the Specifications and any additional requirements imposed by a <br />third -parry governmental entity with authority. <br />mcg-ARC 2120.000 February 28, 2023 - <br />