My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9001 AIRPORT RD BLDG 1 2025-10-21
>
Address Records
>
AIRPORT RD
>
9001
>
9001 AIRPORT RD BLDG 1 2025-10-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2025 2:25:39 PM
Creation date
5/30/2025 8:11:24 AM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
9001
Unit
BLDG 1
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
429
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SNO-ISLE TECH 2O23 SMALL WORKS Section 00 70 00, Page 43 <br />McGRANAHAN ARCHITECTS GENERAL CONDITIONS <br />9.3 APPLICATION FOR PAYMENT <br />9.3.1 Contractor shall submit to Architect an itemized Application for Payment for Work completed <br />during the monthly application period and not covered in a preceding Application for Payment. Such <br />application shall be in the form of AIA forms G702, and shall be supported by such data substantiating <br />Contractor's right to payment as Owner or Architect may require, such as copies of requisitions from <br />Subcontractors and material suppliers and any EEO compliance forms. Such applications shall reflect <br />any retainage amount required herein, shall contain the statements required herein, and shall be <br />accompanied by an updated progress schedule per Section 3.11, and by partial releases on a form <br />provided or approved by Owner and executed by all Subcontractors, mechanics and materialmen who <br />supplied labor or materials or both in the performance of Work for which progress payments were <br />previously made. Such releases shall be complete concerning work performed in prior months and may <br />be conditioned on receipt of payment for work performed in the current month. Such application may <br />not include a request for payment of any amount Contractor does not intend to pay to a Subcontractor, <br />mechanic or materialman because of a dispute or other reason. <br />.1 At the last weekly meeting each calendar month, the Contractor shall submit to the Architect a <br />report on the current progress of the Work as compared to the Contractor's Construction Schedule, and <br />a draft, itemized application for payment for Work performed during the prior month to the date of <br />submission. This shall not constitute a payment request. The Contractor and Architect shall confer at <br />the meeting regarding the current progress of the Work and the amount of payment to which the <br />Contractor is entitled. <br />.2 The Architect or Owner may request the Contractor to provide data substantiating the <br />Contractor's right to payment, including, without limitation: <br />a. Copies of requisitions from Subcontractors; <br />b. lien releases (see subparagraph 5.3.2.4); <br />C. certified payroll records for Contractor and all major Subcontractors, including sitework <br />and utilities, mill work, framing, electrical, mechanical, painting and drywall, and masonry; <br />d. retainage documentation; and <br />e. other documentation as provided elsewhere in the Contract Documents. <br />.3 The Contractor shall not be entitled to make a payment request, nor is any payment due the <br />Contractor, until data requested by Architect or Owner is furnished. <br />.4 After the Contractor and the Architect have met and conferred regarding the draft application, <br />and the Contractor has furnished all progress information required and all data requested by the Architect <br />under Subparagraphs 9.3.1.1 and 9.3.1.2 above, the Contractor may submit a payment request in the <br />agreed -upon amount, in the form of a signed, itemized Application for Payment for Work performed <br />during the prior month to the date of the last weekly meeting referenced above, on a form supplied or <br />approved by the Owner. Among other things, the Application shall state that prevailing wages have <br />_ t mcg-ARC 2120.000 February 28, 2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.