Laserfiche WebLink
SNO-ISLE TECH 2O23 SMALL WORKS <br />MCGRANAHAN ARCHITECTS <br />INSTRUCTIONS TO BIDDERS <br />1.01 GENERAL <br />Section 00 20 00, Page 1 <br />INSTRUCTIONS TO BIDDERS <br />Your bid, to be entitled to consideration, must comply with the following instructions. A contract, if awarded, will be subject <br />to all of the terms and conditions of the Contract Documents, which are comprised of the Invitation to Bid, Instructions to <br />Bidders, Form of Bid, Contract form Supplied by Owner, General Conditions, and other documents provided by Owner in <br />the Project Manual, if any. <br />1.02 EXAMINATION OF SITE AND CONDITIONS <br />The bidder is required to carefully examine the site of the proposed work, the proposal, plans and specifications and contract <br />forms before submitting a proposal. It is mutually agreed that submission of a bid shall be considered prima facie evidence <br />that the bidder has made such examination and is satisfied as to the conditions to be encountered in performing the work as <br />scheduled, or as at any time altered without resulting in increases or decreases of more than the percentage limits stipulated <br />in the hereinafter -mentioned specifications; and as to the character, quality and entities of work to be performed and material <br />to be furnished, including said increases or decreases, and as to the requirements of the plans, specifications, supplemental <br />specifications, special provisions and contract. <br />f <br />i <br />L No statement made by any officer, agent or employee of the Owner or Architect, in relation to the physical conditions <br />pertaining to the site of the work will be binding on the Owner. See paragraph 3.2 of the General Conditions for other <br />requirements. <br />1.03 PROPOSAL AMOUNTS <br />— The sum of money shown on the proposal covering all work included in Base Bid Contract Documents, together with any <br />addenda thereto and/or for unit prices called for, or for any alternates called for, shall include all items of labor, material, <br />equipment, overhead and compensation to complete all of the work under each particular heading. Bid shall not include any <br />applicable State or Local Sales Taxes, but shall include all other taxes, including without limitation, income and business and <br />i <br />occupation taxes. In the event of any discrepancy between the amount written in words and the amount expressed in numbers <br />concerning any bid, the amount written in words shall govern. <br />I i 1.04 SALES TAXES <br />Sales Taxes will be collected from the Owner and will be paid to the State by the Contractor in conformance with the law. A <br />proportion of the amount of Sales Taxes will be added to each payment voucher. The Contractor shall furnish proof of <br />payment of all taxes required by law. <br />1.05 LAWS AND REGULATIONS <br />The bidder is assumed to be familiar with all Federal, State, County and City laws and regulations which in any manner affect <br />those engaged or employed in the work or the materials or Equipment used in the proposed construction, or which in any way <br />affect the conduct of the work, and no pleas of misunderstanding will be considered on account of ignorance thereof. <br />mcg-ARC 2120.000 February 28, 2023 <br />