My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9001 AIRPORT RD BLDG 1 2025-10-21
>
Address Records
>
AIRPORT RD
>
9001
>
9001 AIRPORT RD BLDG 1 2025-10-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2025 2:25:39 PM
Creation date
5/30/2025 8:11:24 AM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
9001
Unit
BLDG 1
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
429
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SNO-ISLE TECH 2O23 SMALL WORKS <br />McGRANAHAN ARCHITECTS <br />Section 00 70 00, Page 63 <br />GENERAL CONDITIONS <br />Owner: Mukilteo School District No. 6 <br />c/o Karen Mooseker <br />Executive Director, District Support Services <br />8925 Airport Road <br />Everett, WA 98204 <br />Architect: McGranahan Architects <br />2111 Pacific, Suite 100 <br />Tacoma, WA 98402 <br />Contractor: TBD <br />13.4 RIGHTS AND REMEDIES <br />13.4.1 An alleged cause of action arising out of this project shall be deemed to have accrued in any and <br />all events no later than the date of substantial completion of construction of the Project. The statute of <br />limitations for filing suit after accrual shall be as provided by law applicable to public works projects in <br />the Washington state. <br />13.4.2 Except as limited herein or specially provided for herein, the parties shall have such other duties, <br />obligations, rights, and remedies otherwise imposed or made available by the law of the State of <br />Washington. <br />13.4.3 The failure of any party to insist in any one or more instances upon the strict performance of any <br />one or more of the provisions of this Contract, or to exercise any right herein contained or provided by <br />law, shall not be construed as a waiver or relinquishment of the performance of such provisions or rights <br />or of the right to subsequently demand such strict performance or exercise of such rights. <br />13.4.4 If any clause, sentence, or provision of this Contract is held as a matter of law to be void or <br />unenforceable, the remainder of the Contract shall be enforceable without such clause, sentence, or <br />provision. <br />13.5 TESTS AND INSPECTIONS <br />13.5.1 Tests, inspections and approvals of portions of the Work required by the Contract Documents or <br />by laws, ordinances, rules, regulations, orders of public authorities having jurisdiction shall be made at <br />an appropriate time. Unless otherwise provided in the Contract Documents, the Contractor shall make <br />timely arrangements for such tests, inspections and approvals with an independent testing laboratory or <br />entity acceptable to the Owner, or with the appropriate public authority, and shall bear all related costs <br />of tests, inspections and approvals except as noted otherwise in the Contract Documents. The Contractor <br />shall give the Architect timely notice of when and where tests and inspections are to be made so the <br />Architect may observe such procedures. The Owner shall bear costs of tests, inspections or approvals <br />which have become requirements after bids were received. <br />mcg-ARC 2120.000 February 28, 2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.