My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
417 TAMARACK AVE 2025-08-19
>
Address Records
>
TAMARACK AVE
>
417
>
417 TAMARACK AVE 2025-08-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2025 1:07:28 PM
Creation date
5/30/2025 8:11:32 AM
Metadata
Fields
Template:
Address Document
Street Name
TAMARACK AVE
Street Number
417
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Areas on the site that have potential erosion problems: <br />None <br />Locations where surface water leaves the site: <br />None <br />Task 2: Select Construction Best Management Practices (BMPs) to be used on your project <br />All new development and redevelopment projects are responsible for preventing erosion and sedimentation <br />during construction. Each of the 13 requirements below contains a list of Best Management Practices (BMPs) <br />that are accepted by the Washington State Department of Ecology (Ecology) for satisfying each requirement. <br />The BMPs below are the most common. For a complete selection of BMPs please see Volume II of Ecology's <br />Stormwater Management Manual for Western Washington. <br />Each of the 13 Elements below must be considered in the SWPPP. Select all <br />BMPs that you will be using to satisfy each requirement. All requirements must <br />4D have at least one item selected. <br />Element 1. Preserve vegetation/mark clearing limits: <br />0 BMP C101: Preserving Natural Vegetation <br />❑ BMP C102: Buffer Zones <br />❑ BMP C103: High Visibility Plastic or Metal Fence <br />❑ Other Per the SWMMWW: ------ ___ <br />❑ Not applicable to my proposed project <br />Explain: Small flat propery_construct berms no natural vegitation_only existing yard, trees, plants. <br />Element 2. Establish construction: <br />0 BMP C105: Stabilized Construction Entrance/Exit <br />❑ BMP C106: Wheel Wash <br />❑ BMP C107: Construction Road/Parking Area Stabilization <br />❑ Other Per the SWMMWW: __________________ <br />❑ Not applicable to my proposed project <br />Explain: Small flat lot _Cont. entrance w/swale and spigot.___ <br />City of Everett Public Works <br />Small Project Stormwater Site Plan Report -Dec 2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.