Laserfiche WebLink
SOURCES: Portion of total amendment quantity (from line 11) that is: <br />12. Purchased from off -site sources..................................................................... 0------- % <br />13. Stockpiled soil and duff from on-site................................................................ 100 ----- 0/10 <br />14. Chipped and stockpiled woody material from on -site ........................................... 0------- % <br />15. Imported topsoil.......................................................................................... 0------- % <br />16. CHECK: The total of lines 12 through 15 should total 100%................................... 100% <br />PLANTING BEDS <br />17. Area of landscaping and planting beds (from line 4 above) .................................... 0 ________ ftz <br />a. Multiply by conversion factor from 3 inches to cubic yards (yd3): x 0.0093 <br />18. MULCH QUANTITY NEEDED 0 --------- yd3 <br />SOURCES: Portion of total mulch quantity (from line 18) that is: <br />19. Purchased from off -site sources............................................................................ N/A Rio <br />20. Chipped and stockpiled woody material from on -site .............................................. N/A Rio <br />21. CHECK: The total of lines 19 and 20 should total 100%......................................... 100% <br />City of Everett Public Works <br />Small Project Stormwater Site Plan Report -Dec 2019 43 <br />