My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
310 E VIEW RIDGE DR 2025-06-30
>
Address Records
>
E VIEW RIDGE DR
>
310
>
310 E VIEW RIDGE DR 2025-06-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2025 8:46:12 AM
Creation date
5/30/2025 9:16:02 AM
Metadata
Fields
Template:
Address Document
Street Name
E VIEW RIDGE DR
Street Number
310
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett Planning/Permitting Notes: <br />Remodel Process/Steps for VR Design/Build <br />• 12 weeks for design <br />• 4 weeks to gather pricing information and present fixed price <br />• Sign Contract w/ approximate start & finish date <br />• Schedule Start Date — Average 2 — 6 Weeks from signing depending on size of job & schedule <br />openings. <br />• Order all material to assure pricing. <br />• Average project duration 16 — 20 weeks or 4 — 5 months. <br />Permit Timing City of Everett: <br />• Notice on submittal tray "Allow 7 —10 days for Processing Intake <br />o 9 Months ago received permit in 10 days. <br />• Website states "Allow 6-9" weeks <br />• Last -time in office front desk "Allow 10 —14 weeks with no expediting process for remodels <br />• All submitted-plkns: Residential Remodels, New Builds and Commercial in same pile. <br />/ • Negd expedited pa for Remodel. p <br />/\ 310 E Viewridge Everett Agi gin Place, living in basement UO6 --00 <br />• Project Start_Dat6: March 7th, 2022 <br />Projected Project Completion: September 161h, 2022 <br />• Stop Work, by Electrical inspector: May 161h, 2022 <br />• Project Delay Today: 8 Weeks <br />Trade Partners Plumbing & Electrician pulled their own permits <br />We pulled a permit on a job on Rucker last year and it took 10 days for approval. We were not shut <br />down. <br />Requirement for structural drawing when no structural work is being done? Nowhere elsel <br />Emailed form letter & "requirements for one- and two-family residential projects" <br />• "Submitted documents are not sufficiently developed" <br />• Not sure what -applies to Remodel???? <br />530133'd Ave W. Everett Ki chen Remodel with relocation of dining room & office. <br />f <br />• Gable end truss engineering required <br />• "Unpermitted work" at enclosed covered deck??? (Pictures) <br />B 220- 46 :-7- <br />Emailed same documents as 310: <br />• Emailed form letter & "requirements for one- and two-family residential projects" <br />• "Submitted documents are not sufficiently developed" <br />i7Lt <br />
The URL can be used to link to this page
Your browser does not support the video tag.