Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: U2010-020 Description: BLDG A-WATER,SEWER SYSTEM DEV FEES FOR DWELLING <br /> UNITS ONLY <br /> Applied: 10/14/2020 Approved: 10/14/2020 Site Address: 3910 RIVERFRONT BLVD <br /> Issued: 12/29/2020 Finaled: 10/20/2023 City,State Zip Code: EVERETT,WA 98201 <br /> Status: FINALED Applicant: Eric Evans <br /> Parent Permit: B2003-013 Owner: RIVERFRONT PHASE 1,LLC <br /> Parent Project: Contractor: RIVERFRONT COMMRCL INVEST LLC <br /> Details: <br /> BLDG A-WATER,SEWER SYSTEM DEV FEES FOR DWELLING UNITS ONLY <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 6/21/2021 6/21/2021 PERMIT EXTENSION KATHY COLLISON EXTENSION COVID EXTENSION <br /> APPROVED <br /> Notes: <br /> PERMIT EXTENSION <br /> 2/9/2022 2/9/2022 EXTENSION- CINDY BERGSMA <br /> REASON REQUIRED APPROVED <br /> Notes: <br /> Thanks for calling me back today. Below is a snapshot of expired permits that we will extend/re-open.Construction has started/resumed on the parent <br /> permits(Sitework,Building A&Building B)but have experienced significant delays due to COVID 19. <br /> Dave Fiala <br /> Project Engineer <br /> Shelter Holdings,LLC <br /> Cell 425-213-677 <br /> PERMIT EXTENSION <br /> EXTENSION <br /> 3/2/2023 3/2/2023 (REASON Unassigned <br /> APPROVED <br /> REQUIRED) <br /> Notes: <br /> From:Dave Fiala<Dave.Fiala@Shelterholdings.com> <br /> Sent:Thursday,March 2,2023 7:30 AM <br /> To:Cindy Bergsma<CBergsma@everettwa.gov> <br /> Subject:RE: [EXTERNAL] Riverfront-Sitework Projects-Permit renewal/extension. <br /> Morning Cindy, <br /> Project delays due to COVIDI9. <br /> Dave Fiala <br /> CQA Manager/Project Engineer <br /> Shelter Holdings,LLC <br /> 11624 SE 5th St.Suite 210 <br /> Bellevue,WA 98005 <br /> Cell:425-213-6779 <br /> I <br /> Printed:Wednesday, 14 May, 2025 1 of 2 rk <br /> SUPERION <br />