Laserfiche WebLink
ME a <br />City of Everett <br />EVERETT Reviewed for Permit 07/01/2022 <br />INSIGHT ENGINEERING CO. ......a*• <br />STORMWATER SITE PLAN <br />For <br />MAVERICK 2 <br />Prepared for <br />City of Everett <br />2930 Wetmore Ave <br />Everett, WA-98201 <br />425.257.8700 <br />Applicant/Owner: <br />Contact: <br />Maverick Consulting LLC <br />Brian R. Kalab, P.E. <br />P.O. Box 1154 <br />P.O. Box 1478 <br />Everett, WA 98206 <br />Everett, WA 98206 <br />425.303.9363 <br />Project Site Location: <br />6522 Wetmore Ave SE, <br />Everett, WA 98203 <br />IECO Project: 19-1036 <br />Certified Erosion and Sedimentation Control Lead: <br />Brian R. Kalab, P.E. <br />Stormwater Site Plan Prepared By: <br />Nicole Maas E.I.T. <br />Stormwater Site Plan Preparation Date: <br />July 14, 2021 <br />Stormwater Site Plan Revision Date: <br />January 14, 2022 <br />Approximate Construction Date: <br />May 1, 2022 <br />0610612022 <br />P.O. Box 1478 • Everett, WA 98206 • P: 425.303.9363 <br />• info@insightengineering.net <br />