Laserfiche WebLink
Element #12 — Manage the Project <br />Erosion and sediment control BMPs for this project have been designed based on the <br />following principles: <br />Design the project to fit the existing topography, soils, and drainage patterns; Emphasize <br />erosion control rather than sediment control; Minimize the extent and duration of the area <br />exposed; Keep runoff velocities low; Retain sediment on site; Thoroughly monitor site and <br />maintain all ESC measures and schedule major earthwork during the dry season. The <br />SWPPP shall be modified as necessary to include additional or modified BMPs designed to <br />correct problems identified. Revisions to the SWPPP shall be completed within seven (7) <br />days following the inspection. <br />Element #13 — Protect LID BMPs <br />Protect all LID BMPs from sedimentation through installation and maintenance of <br />erosion and sediment control BMPs on portions of the site that drain into the LID <br />BMPs. Restore the BMPs to their fully functioning condition if they accumulate <br />sediment during construction. Maintain the infiltration capabilities of LID BMPs by <br />protecting against compaction by construction equipment and foot traffic. <br />Permeable pavement fouled with sediments or no longer passing an initial <br />infiltration test must be cleaned using procedures in accordance with the 2019 <br />SWMMWW or the manufacturer's procedure. <br />Insight Engineering Co. — Stormwater Site Plan 05/31/2022 <br />-17- <br />