My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6522 WETMORE AVE 2025-08-19
>
Address Records
>
WETMORE AVE
>
6522
>
6522 WETMORE AVE 2025-08-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2025 4:04:08 PM
Creation date
5/30/2025 9:16:35 AM
Metadata
Fields
Template:
Address Document
Street Name
WETMORE AVE
Street Number
6522
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Element #12 — Manage the Project <br />Erosion and sediment control BMPs for this project have been designed based on the <br />following principles: <br />Design the project to fit the existing topography, soils, and drainage patterns; Emphasize <br />erosion control rather than sediment control; Minimize the extent and duration of the area <br />exposed; Keep runoff velocities low; Retain sediment on site; Thoroughly monitor site and <br />maintain all ESC measures and schedule major earthwork during the dry season. The <br />SWPPP shall be modified as necessary to include additional or modified BMPs designed to <br />correct problems identified. Revisions to the SWPPP shall be completed within seven (7) <br />days following the inspection. <br />Element #13 — Protect LID BMPs <br />Protect all LID BMPs from sedimentation through installation and maintenance of <br />erosion and sediment control BMPs on portions of the site that drain into the LID <br />BMPs. Restore the BMPs to their fully functioning condition if they accumulate <br />sediment during construction. Maintain the infiltration capabilities of LID BMPs by <br />protecting against compaction by construction equipment and foot traffic. <br />Permeable pavement fouled with sediments or no longer passing an initial <br />infiltration test must be cleaned using procedures in accordance with the 2019 <br />SWMMWW or the manufacturer's procedure. <br />Insight Engineering Co. — Stormwater Site Plan 05/31/2022 <br />-17- <br />
The URL can be used to link to this page
Your browser does not support the video tag.