My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6522 WETMORE AVE 2025-08-19
>
Address Records
>
WETMORE AVE
>
6522
>
6522 WETMORE AVE 2025-08-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2025 4:04:08 PM
Creation date
5/30/2025 9:16:35 AM
Metadata
Fields
Template:
Address Document
Street Name
WETMORE AVE
Street Number
6522
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GEOTECHNICAL INVESTIGATION <br />EVERETT, WASHINGTON <br />October 28, 2019 <br />COBALT <br />G E 0 S C I E N C E S <br />Infiltration of stormwater runoff is not feasible at this site. The property is underlain by dense to very <br />dense glacial till which is nearly impermeable and acts as a restrictive layer. We recommend direct <br />connection of new runoff collection devices to City stormwater infrastructure. <br />8.o Recommendations <br />8.m Site Preparation <br />Trees, shrubs and other vegetation should be removed prior to stripping of surficial organic -rich soil and <br />fill. Based on observations from the site investigation program, it is anticipated that the stripping depth <br />will be 6 to 12 inches. Deeper excavations will be necessary below large trees, existing foundation areas, <br />and in any areas underlain by undocumented fill materials. <br />The native soils consist of silty -sand with gravel. These soils may be used as structural fill provided they <br />achieve compaction requirements and are within 3 percent of the optimum moisture. Some of these soils <br />may only be suitable for use as fill during the summer months, as they will be above the optimum <br />moisture levels in their current state. These soils are variably moisture sensitive and may degrade during <br />periods of wet weather and under equipment traffic. <br />Imported structural fill should consist of a sand and gravel mixture with a maximum grain size of 3 inches <br />and less than 5 percent fines (material passing the U.S. Standard No. 200 Sieve). Structural fill should be <br />placed in maximum lift thicknesses of 12 inches and should be compacted to a minimum of 95 percent of <br />the modified proctor maximum dry density, as determined by the ASTM D 1557 test method. <br />8.1.2 Temporary Excavations <br />Based on our understanding of the project, we anticipate that the grading could include local cuts on the <br />order of approximately 4 feet or less for foundation and utility placement. Any deeper excavations should <br />be sloped no steeper than 1.5H:1V in loose soils, 1H:1V in medium dense native soils and 3/4H:1V in <br />dense to very dense native soils. If an excavation is subject to heavy vibration or surcharge loads, we <br />recommend that the excavations be sloped no steeper than 2H:1V, where room permits. <br />Temporary cuts should be in accordance with the Washington Administrative Code (WAC) Part N, <br />Excavation, Trenching, and Shoring. Temporary slopes should be visually inspected daily by a qualified <br />person during construction activities and the inspections should be documented in daily reports. The <br />contractor is responsible for maintaining the stability of the temporary cut slopes and reducing slope <br />erosion during construction. <br />Temporary cut slopes should be covered with visqueen to help reduce erosion during wet weather, and the <br />slopes should be closely monitored until the permanent retaining systems or slope configurations are <br />complete. Materials should not be stored or equipment operated within 10 feet of the top of any <br />temporary cut slope. <br />Soil conditions may not be completely known from the geotechnical investigation. In the case of <br />temporary cuts, the existing soil conditions may not be completely revealed until the excavation work <br />exposes the soil. Typically, as excavation work progresses the maximum inclination of temporary slopes <br />will need to be re-evaluated by the geotechnical engineer so that supplemental recommendations can be <br />4 <br />PO Box 82243 <br />Kenmore, WA 98028 <br />cobaltgeoOgmail.com <br />2o6-331-1097 <br />
The URL can be used to link to this page
Your browser does not support the video tag.