Laserfiche WebLink
Table V-A.22: Maintenance Standards - Permeable Pavement (continued) <br />Recommended Frequency a <br />Condition when Maintenance is Needed <br />Component <br />(Standards) <br />Action Needed (Procedures) <br />Inspection <br />Routine Maintenance <br />Aggregate is clogged: Ponding on surface or <br />Ab <br />water flows off the permeable pavement surface <br />Rehabilitate per manufacturer's recommendations. <br />during a rain event (does not infiltrate) <br />• Remove pins, pry up grid segments, and replace grass <br />A <br />Paving grid missing or damaged <br />• Replace grid segments where three or more adjacent rings are broken or damaged <br />• Follow manufacturer guidelines for repairing surface. <br />A <br />Settlement of surface <br />May require resetting <br />• Restore growing medium, reseed or plant, aerate, and/or amend vegetated area as needed <br />A <br />Poor grass coverage in paving grid <br />• Traffic loading may be inhibiting grass growth; reconsider traffic loading if feasible <br />As needed <br />None (routine maintenance) <br />Use a mulch mower to mow grass <br />• Sprinkle a thin layer of compost on top of grass surface (112" top dressing) and sweep it in <br />A <br />None (routine maintenance) <br />• Do not use fertilizer <br />• Manually remove weeds <br />A <br />Weeds present <br />• Mow, torch, or inoculate and replace with preferred vegetation <br />Inlets/Outlets/Pipes <br />Inlet/outlet <br />A <br />Pipe is damaged <br />Repair/replace <br />pipe <br />A <br />Pipe is clogged <br />Remove roots or debris <br />Clean orifice at least bian- <br />Plant roots, sediment or debris reducing caps- <br />• Jet clean or rota cut debris/roots from underdrain s <br />rotary ( ) <br />Underdrain pipe <br />Clean pipe as needed <br />nually (may need more fre- <br />quail cleaning during wet <br />city of underdrain (may cause prolonged draw- <br />• If underdrains are equipped with a flow restrictor (e.g., orifice) to attenuate flows, the orifice must be cleaned <br />season) <br />down period) <br />regularly <br />Clean orifice at least bian- <br />• Jet clean or rotary cut debris/roots from under-drain(s) <br />Raised subsurface <br />overflow pipe <br />Clean as needed <br />pipe <br />nually (may need more fre- <br />quent cleaning during wet <br />Plant roots, sediment or debris reducing capa- <br />city of underdrain <br />If underdrains are equipped with a flow restrictor (e.g., orifice) to attenuate flows, the orifice must be cleaned <br />season) <br />regularly <br />Outlet structure <br />A, S <br />Sediment, vegetation, or debris reducing capa- <br />• Clear the blockage <br />cityof outlet structure <br />Identify the source of the blockage and take actions to prevent future blockages <br />Overflow <br />g <br />Native soil is exposed or other signs of erosion <br />Repair erosion and stabilize surface <br />damage are present at discharge point <br />Aggregate Storage Reservoir <br />Water remains in the storage aggregate longer <br />If immediate cause of extended ponding is not identified, schedule investigation of subsurface materials or other <br />Observation port <br />A, S <br />than anticipated by design after the end of a <br />potential causes of system failure. <br />storm <br />2019 Stormwater Management Manual for Western Washington <br />Volume V - AppendixA - Page 1028 <br />