My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006 VIRGINIA AVE 2025-08-05
>
Address Records
>
VIRGINIA AVE
>
2006
>
2006 VIRGINIA AVE 2025-08-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2025 1:34:09 PM
Creation date
5/30/2025 2:11:59 PM
Metadata
Fields
Template:
Address Document
Street Name
VIRGINIA AVE
Street Number
2006
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: P2312-002 Description: Remodel plumbing <br /> Applied: 12/5/2023 Approved: 1/31/2024 Site Address: 2006 VIRGINIA AVE <br /> Issued:2/1/2024 Finaled: 10/25/2024 City,State Zip Code: EVERETT,WA 98201-2445 <br /> Status: FINALED Applicant:Soheyl Ramezani <br /> Parent Permit: B2402-064 Owner:Soheyl Ramezani <br /> Parent Project: Contractor: OWNER <br /> Details: <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 2/5/2024 2/5/2024 PLUMB 03-ROUGH JASON CANCELLED eTRAKiT Inspection Request <br /> IN MORRISSEY <br /> Notes: <br /> 2/3/2024 1:04 PM Soheyl Ramezani <br /> Contact Name:Soheyl Ramezani <br /> Site Address:2006 VIRGINIA AVE <br /> Phone:2067955202 <br /> e-Mail:oagahi@yahoo.com <br /> -Owner called to cancel today's inspection as plumbing is not ready. He will reschedule online when ready. <br /> 2/6/2024 F2/6/2024 PLUMB 03-ROUGH JASON CORRECTION see notes <br /> IN MORRISSEY REQUIRED <br /> Notes: <br /> 2/5/2024 3:11 PM Soheyl Ramezani <br /> Contact Name:Soheyl Ramezani <br /> Site Address:2006 VIRGINIA AVE <br /> Phone:2067955202 <br /> e-Mail:oagahi@yahoo.com <br /> -Install long sweep drainage fitting on kitchen vent below flood level per UPC chap 9.Vertical to horizontal.-Roll vent for tub above drain centerline per <br /> UPC chap 9.Must be wye rolled above centerline or on its back.-Strap ABS pipe every 4'per UPC chap 3.-Insulate all hot and cold piping outside <br /> conditioned building envelope per UPC chap 3.-Install frost free hose bibs per UPC. <br /> 2/6/2024 2/6/2024 PLUMB 03-ROUGH JASON CORRECTION see notes <br /> IN MORRISSEY REQUIRED <br /> Notes: <br /> -Obtain building permit before further inspections commence.You will need two sets of building plans to submit for review showing before and after <br /> remodel.'All other sub permits are issued. <br /> I <br /> Printed:Tuesday,20 May,2025 1 of 2 rk <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.