Laserfiche WebLink
POST-INSTALLED ANCHORS REPORT MAYES I lrerracon <br /> Report Number: M7221730.0001 <br /> Service Date: 10/17/22 20225 Cedar Valley Rd Ste 110 <br /> Report Date: 10/19/22 Lynnwood, WA 98036-6365 <br /> 425-742-9360 <br /> Client Project <br /> Conveyor Solutions Inc OnTrac Everett <br /> Attn: Camron Franklin 200 W Marine View Dr <br /> 1450 N McLean Blvd Everett, WA <br /> Elgin, IL 60123 <br /> Project Number: M7221730 <br /> Permit No. B2205-062 <br /> General Information <br /> Michael Trinka requested Mayes/Terracon be on site for Mechanical Anchor Observation of the mechanical <br /> anchors being installed by Conveyor Solutions. Results of observation(s) performed today were reported to <br /> Michael Trinka. <br /> The construction documents referenced for this observation include the structural calculation report from EPIQ <br /> Structural Solutions. <br /> Anchor System Information <br /> The following anchor types were used during today's observation: <br /> Anchor Anchor Anchor Required Torque <br /> No. Anchor Type ICC Report Diameter Length (foot-pounds) Referenced <br /> 1 Simpson Titen HD ESR 2713 1/2" 4" 65 Structural Calculation Report <br /> Testing Equipment <br /> Test Equipment Description Calibration Date <br /> Mayes/Terracon torque wrench#1297 03/03/22 <br /> Anchor Installation <br /> The above anchors were installed as follows: <br /> Anchor Locations Quantity Hole Depth & Embedment Spacing &Edge Status <br /> No. (tested/total) Diameter Distance <br /> 1 Everett,WA 300/3000 4"& 1/2" 3-1/2" 4"& 10" Complies <br /> Holes were cleaned prior to installation using a vacuum. Ambient temperature during observation was 62°F. <br /> Compliance <br /> Based on our observations and testing, the post-installed anchors referenced above appear to be in general <br /> accordance with the project documents. <br /> Services: Special Inspections/ Materials Testing <br /> Mayes/Terracon Rep.: Earl Uy <br /> Reported To: Conveyor Solutions <br /> Contractor: Conveyor Solutions <br /> Report Distribution: <br /> (1)Conveyor Solutions Inc,Camron (1)City of Everett WA,Kurt Keck <br /> Franklin <br /> (1)Mayes Testing Engineers,Inc, (1)Mayes Testing Engineers,Inc,Todd Reviewed By: <br /> Dnnna Pollard Wirt <br /> Barry Tuttle <br /> Project Field Manager <br /> The tests were performed in general accordance with applicable ASTM,AASHTO,or DOT test methods. This report is exclusively for the use of the client indicated above <br /> and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at <br /> the location(s)referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. <br /> DM018,04-29-22,Rev.5 Page 1 of 1 <br />