My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3810 RIVERFRONT BLVD BLDG B 2025-07-15
>
Address Records
>
RIVERFRONT BLVD
>
3810
>
BLDG B
>
3810 RIVERFRONT BLVD BLDG B 2025-07-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2025 11:49:25 AM
Creation date
6/2/2025 7:34:14 AM
Metadata
Fields
Template:
Address Document
Street Name
RIVERFRONT BLVD
Street Number
3810
Tenant Name
BLDG B
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT <br /> Public Works Department <br /> December 23, 2019 <br /> Eric C. Evans <br /> Shelter Holdings <br /> 11624 SE 5th Street, Suite 210 <br /> Bellevue, WA 98005 <br /> eric.evans(�)shelterholdinas.com <br /> Owner: Shelter Holdings <br /> Job Address: Building B <br /> Plan Check No: TBD (intake not completed yet) <br /> RE: Mechanical Permit Review Letter <br /> Dear Mr. Evans, <br /> In response to the application for a mechanical permit, the plans have been examined and you <br /> are advised that revisions may be necessary before a permit can be issued. Please review and <br /> respond to the comments below. <br /> Mechanical <br /> 1. The following comments apply to Elevator Machinery Room 130: <br /> a. The makeup air should be from the exterior of the building. Section 3005.2 <br /> b. The walls separating the room from the remainder of the building are two-hour <br /> fire barriers per Section 3005.4 <br /> i. A fire damper should be provided for the duct penetration into the room <br /> by FCU 1 as shown on Sheet MB101.N. Section 717.5.2 <br /> 2. The following comments apply to the IDF rooms on floors 2-6: <br /> a. The rooms should not receive their supply air from the corridor. Section 1020.5 <br /> b. The duct penetration into the rooms from the corridor should be protected by <br /> smoke dampers. Section 717.5.4.1, Item 3 <br /> In order for the processing of your application to continue, it will be necessary to provide the <br /> Building Division with two new sets of revised construction documents reflecting the corrections <br /> requested. Please include a response letter which indicates how the corrections were resolved. <br /> All codes cited refer to the 2015 International Building Code (IBC), 2015 International Existing <br /> Building Code (IEBC), the 2015 International Fire Code (IFC), the 2015 International Mechanical <br /> Code (IMC), and/or the 2015 Washington State Energy Code (WSEC), as amended by the State <br /> of Washington and adopted by the City of Everett. The current IBC referenced standard for <br /> 3200 Cedar Street © 425.257.8810 tlee@everettwa.gov <br /> Everett, WA 98201 425.257.8857 fax everettwa.gov <br />
The URL can be used to link to this page
Your browser does not support the video tag.