My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3702 W MUKILTEO BLVD C HARBORS EDGE TOWNHOMES 2025-08-13
>
Address Records
>
W MUKILTEO BLVD
>
3702
>
HARBORS EDGE TOWNHOMES
>
3702 W MUKILTEO BLVD C HARBORS EDGE TOWNHOMES 2025-08-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2025 2:39:06 PM
Creation date
6/2/2025 7:48:30 AM
Metadata
Fields
Template:
Address Document
Street Name
W MUKILTEO BLVD
Street Number
3702
Unit
C
Tenant Name
HARBORS EDGE TOWNHOMES
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: P2404-058 Description: Plumbing FOR NEW TOWNHOME HARBOR'S EDGE-UNIT C <br /> Applied:4/25/2024 Approved:4/26/2024 Site Address: 3702 W MUKILTEO BLVD UNIT C <br /> Issued:4/29/2024 Finaled: 11/27/2024 City,State Zip Code: EVERETT,WA 98203-1248 <br /> Status: FINALED Applicant:MAR PLUMBING LLC <br /> Parent Permit: B2304-048 Owner:SAGE HARBORS EDGE LLC <br /> Parent Project: Contractor:JBAR PLUMBING LLC <br /> Details: <br /> New Plumbing <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> PLUMB 02- <br /> 4/30/2024 4/30/2024 GROUND JEFF M RHODE APPROVAL see notes <br /> WORK/SLAB <br /> Notes: <br /> -inspection preformed while onsite for underground inspection on P2404-056 <br /> 8/22/2024 8/22/2024 PLUMB 03-ROUGH JASON CORRECTION see notes <br /> IN MORRISSEY REQUIRED <br /> Notes: <br /> -Finish connecting toilets to flow through sprinkler system.Static test at minimum on toilet supplies. <br /> 8/26/2024 8/26/2024 PLUMB 03-ROUGH JASON CORRECTION see notes <br /> IN MORRISSEY REQUIRED <br /> Notes: <br /> -Finish connecting toilets to flow through sprinkler system.Static test at minimum on toilet supplies. <br /> 8/30/2024 8/30/2024 PLUMB ON ROUGH JEFF M RHODE NOT READY <br /> Notes: <br /> 9/5/2024 9/5/2024 PLUMB 03-ROUGH JASON APPROVAL <br /> IN MORRISSEY <br /> Notes: <br /> 11/18/2024 11/18/2024 PLUMB 08-FINAL** JASON CORRECTION see notes <br /> MORRISSEY REQUIRED <br /> Notes: <br /> Moved forward from 11/20/24 <br /> Dishwasher drain and water supply are not connected.Disposal plug has not been removed for dishwasher drain connection.-No hot water to both <br /> upstairs.master bath lays <br /> I <br /> Printed: Monday, 12 May,2025 1 of 2 rk <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.