Laserfiche WebLink
-3- <br /> h. Permittee shall comply with the conditions specified in the Washington State <br /> Department of Ecology Coastal Zone Management Consistency Determination dated <br /> January 14, 2022. <br /> We have reviewed your project pursuant to the requirements of the Endangered <br /> Species Act, the Magnuson-Stevens Fishery Conservation and Management Act and <br /> the National Historic Preservation Act. We have determined this project complies with <br /> the requirements of these laws provided you comply with all of the permit general and <br /> special conditions. <br /> A conditioned Water Quality Certification (WQC) and Coastal Zone Management <br /> (CZM) consistency determination response has been issued by the Washington State <br /> Department of Ecology for your project and is enclosed. You must comply with the <br /> conditions specified in the WQC and CZM determination forthis NWP authorization to <br /> be valid. <br /> You have not requested a jurisdictional determination for this proposed project. If <br /> you believe the U.S. Army Corps of Engineers does not have jurisdiction over all or <br /> portions of your project you may request a preliminary or approved jurisdictional <br /> determination (JD). If one is requested, please be aware that we may require the <br /> submittal of additional information to complete the JD and work authorized in this letter <br /> may not occuruntil the JD has been completed. <br /> Our verification of this 2021 NWP authorization is valid until March 14, 2026 unless <br /> the NWP is modified, reissued, or revoked prior to that date. If the authorized work for <br /> the 2021 NWP authorization has not been completed by that date and you have <br /> commenced or are under contract to commence this activity before March 14, 2026, you <br /> will have until March 14, 2027, to complete the activity under the enclosed terms and <br /> conditions of this NWP. Failure to comply with all terms and conditions of this NWP <br /> verification invalidates this authorization and could result in a violation of Section 404 of <br /> the Clean Water Act and/or Section 10 of the Rivers and Harbors Act. You must also <br /> obtain all local, State, and other Federal permits that apply to this project. <br /> Upon completing the authorized work, you must fill out and return the enclosed <br /> Certificate of Compliance with Department of the Army Permit. All compliance reports <br /> should be submitted to the U.S. Army Corps of Engineers, Seattle District, Regulatory <br /> Branch electronically at nws.compliance@usace.army.mil. Thank you foryour <br /> cooperation during the permitting process. We are interested in your experience with <br /> our Regulatory Program and encourage you to complete a customer service survey. <br /> Referenced documents and information about our program are available on our website <br /> at www.nws.usace.army.mil, select "Regulatory Permit Information". A copy of this letter <br />