My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7007 SEAWAY BLVD 2025-07-14
>
Address Records
>
SEAWAY BLVD
>
7007
>
7007 SEAWAY BLVD 2025-07-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2025 1:49:51 PM
Creation date
6/2/2025 12:56:45 PM
Metadata
Fields
Template:
Address Document
Street Name
SEAWAY BLVD
Street Number
7007
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
209
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stormwater Pollution Prevention Plan <br /> 3.1.8 Element#8—Stabilize Channels and Outlets <br /> Where site runoff is to be conveyed in channels, or discharged to a stream or some other natural <br /> drainage point, efforts will be taken to prevent downstream erosion. There are no new channels <br /> or outlets to stabilize for this site and therefore no BMP's for this element are proposed at this <br /> time. <br /> 3.1.9 Element#9—Control Pollutants <br /> All pollutants, including waste materials and demolition debris,that occur during construction <br /> shall be handled and disposed of in a manner that does not cause contamination of stormwater. <br /> Good housekeeping and preventative measures will be taken to ensure that the site will be kept <br /> clean, well-organized, and free of debris. If required, BMPs to be implemented to control <br /> specific sources of pollutants are discussed below. <br /> Vehicles, construction equipment, and/or petroleum product storage/dispensing: <br /> • All vehicles, equipment, and petroleum product storage/dispensing areas will be <br /> inspected regularly to detect any leaks or spills, and to identify maintenance needs to <br /> prevent leaks or spills. <br /> • Spill prevention measures, such as drip pans, will be used when conducting maintenance <br /> and repair of vehicles or equipment. <br /> • Contaminated surfaces shall be cleaned immediately following any discharge or spill <br /> incident. <br /> Concrete and grout: Process water and slurry resulting from concrete work will be prevented <br /> from entering the waters of the State by implementing Concrete Handling measures (BMP <br /> C151). <br /> In order to prevent, reduce, or eliminate the discharge of pollutants from material delivery and <br /> storage to the stormwater system, Material Delivery and Storage Contamination(BMP C153) <br /> shall be implemented. <br /> Sanitary wastewater: Portable sanitation facilities will be firmly secured, regularly maintained, <br /> and emptied when necessary. <br /> Solid Waste: Solid waste will be stored in secure, clearly marked containers. <br /> 3.1.10 Element#10—Control Dewatering <br /> Dewatering is not anticipated,but if dewatering of trenches and/or excavations is needed it will be <br /> completed under the direct supervision of the project CESCL. All stormwater that leaves the <br /> project site will comply with permit discharge requirements. <br /> SNBL USA, LTD—Seaway Commercial Center <br /> SWPPP 7 August, 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.