Laserfiche WebLink
Stormwater Pollution Prevention Plan <br /> Assess the site conditions and construction activities that could impact <br /> the quality of stormwater, and <br /> Assess the effectiveness of erosion and sediment control measures used <br /> to control the quality of stormwater discharges. <br /> ■ A Certified Erosion and Sediment Control Lead shall be on-site or on-call at <br /> all times. <br /> ■ Whenever inspection and/or monitoring reveals that the BMPs identified in <br /> this SWPPP are inadequate, due to the actual discharge of or potential to <br /> discharge a significant amount of any pollutant, appropriate BMPs or design <br /> changes shall be implemented as soon as possible. <br /> Maintaining an Updated Construction SWPPP <br /> ■ This SWPPP shall be retained near the construction activities or within <br /> reasonable access. <br /> ■ The SWPPP shall be modified whenever there is a change in the design, <br /> construction, operation, or maintenance at the construction site that has, or <br /> could have, a significant effect on the discharge of pollutants to waters of the <br /> state. <br /> ■ The SWPPP shall be modified if, during inspections or investigations <br /> conducted by the owner/operator, or the applicable local or state regulatory <br /> authority, it is determined that the SWPPP is ineffective in eliminating or <br /> significantly minimizing pollutants in stormwater discharges from the site. <br /> The SWPPP shall be modified as necessary to include additional or modified <br /> BMPs designed to correct problems identified. Revisions to the SWPPP <br /> shall be completed within seven (7) days following the inspection. <br /> 3.1.13 Element#13—Protect On-site Stormwater Management BMPs <br /> The low impact development BMPs proposed for this project are required to be protected. <br /> Low impact development facilities on site consist of a post-construction quality and depth <br /> in accordance with BMP 5.13 within Volume V, Chapter 11 of the 2019 SWMMWW. <br /> Any natively vegetated areas to remain on site shall be protected from compaction during <br /> construction. Areas on site proposed to be lawn or landscaped area shall amend disturbed <br /> soils. Restoration of the facilities must occur after completion of the project in order to <br /> remove any sediment accumulated within the facilities which might affect infiltration <br /> rates. <br /> SNBL USA, LTD—Seaway Commercial Center <br /> SWPPP 9 August, 2022 <br />