My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7007 SEAWAY BLVD 2025-07-14
>
Address Records
>
SEAWAY BLVD
>
7007
>
7007 SEAWAY BLVD 2025-07-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2025 1:49:51 PM
Creation date
6/2/2025 12:56:45 PM
Metadata
Fields
Template:
Address Document
Street Name
SEAWAY BLVD
Street Number
7007
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
209
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stormwater Pollution Prevention Plan <br /> 7.2 Reporting <br /> 7.2.1 Discharge Monitoring Reports <br /> Discharge Monitoring Reports (DMRs) will be submitted to Ecology monthly. If there was no <br /> discharge during a given monitoring period the DMR will be submitted as required,reporting"No <br /> Discharge". If a benchmark was exceeded, a brief summary of inspection results and remedial <br /> actions taken will be included. If sampling could not be performed during a monitoring period, a <br /> DMR will be submitted with an explanation of why sampling could not be performed. <br /> The DMR due date is fifteen (15) days following the end of each calendar month. DMRs will be <br /> reported online through Ecology's WQWebDMR System. <br /> 7.2.2 Notification of Noncompliance <br /> If any of the terms and conditions of the permit are not met, and it causes a threat to human <br /> health or the environment, the following steps will be taken in accordance with permit section <br /> SS.F: <br /> 1. Ecology will be immediately notified of the failure to comply. <br /> 2. Immediate action will be taken to control the noncompliance issue and to <br /> correct the problem. If applicable, sampling and analysis of any <br /> noncompliance will be repeated immediately and the results submitted to <br /> Ecology within five (5) days of becoming aware of the violation. <br /> 3. A detailed written report describing the noncompliance will be submitted to <br /> Ecology within five (5) days,unless requested earlier by Ecology. <br /> Any time turbidity sampling indicates turbidity is 250 nephelometric turbidity units (NTU) or <br /> greater or water transparency is 6 centimeters or less, the Ecology regional office will be notified <br /> by phone within 24 hours of analysis as required by permit condition SS.A(see Section 5.0 of <br /> this SWPPP for contact information). <br /> In accordance with permit condition S4.F.6.b, the Ecology regional office will be notified if <br /> chemical treatment other than CO2 sparging is planned for adjustment of high pH water(see <br /> Section 5.0 of this SWPPP for contact information). <br /> 7.2.3 Permit Application and Changes <br /> In accordance with permit conditions S2.A, a complete application form will be submitted to <br /> Ecology and the appropriate local jurisdiction (if applicable) to be covered by the General <br /> Permit. <br /> SNBL USA, LTD—Seaway Commercial Center <br /> SWPPP 18 August, 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.