My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7007 SEAWAY BLVD 2025-07-14
>
Address Records
>
SEAWAY BLVD
>
7007
>
7007 SEAWAY BLVD 2025-07-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2025 1:49:51 PM
Creation date
6/2/2025 12:56:45 PM
Metadata
Fields
Template:
Address Document
Street Name
SEAWAY BLVD
Street Number
7007
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
209
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SUMMARY OF PERMIT REPORT SUBMITTALS <br /> Refer to the Special and General Conditions within this permit for additional submittal requirements. <br /> Appendix A provides a list of definitions.Appendix B provides a list of acronyms. <br /> Table 1 Summary of Required Submittals <br /> Permit Submittal Frequency First Submittal Date <br /> Section <br /> S5.A and High Turbidity/Transparency Phone As Necessary Within 24 hours <br /> S8 Reporting <br /> S5.B Discharge Monitoring Report Monthly* Within 15 days following the <br /> end of each month <br /> S51 and Noncompliance Notification - As necessary Within 24 hours <br /> S8 Telephone Notification <br /> S5.F Noncompliance Notification - Written As necessary Within 5 Days of <br /> Report non-compliance <br /> S9.D Request for Chemical Treatment Form As necessary Written approval from <br /> Ecology is required prior to <br /> using chemical treatment <br /> (with the exception of dry ice, <br /> CO2 or food grade vinegar to <br /> adjust pH) <br /> G2 Notice of Change in Authorization As necessary <br /> G6 Permit Application for Substantive As necessary <br /> Changes to the Discharge <br /> G8 Application for Permit Renewal 1/permit cycle No later than 180 days <br /> before expiration <br /> S2.A Notice of Permit Transfer As necessary <br /> G19 Notice of Planned Changes As necessary <br /> G21 Reporting Anticipated Non-compliance As necessary <br /> NOTE: *Permittees must submit electronic Discharge Monitoring Reports(DMRs)to the Washington State <br /> Department of Ecology monthly, regardless of site discharge,for the full duration of permit coverage. Refer <br /> to Section S5.6 of this General Permit for more specific information regarding DMRs. <br /> Construction Stormwater General Permit Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.