Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 12/30/2024 12/30/2024 BLDG 12- RAKEEB KHAN PARTIAL <br /> INSULATION APPROVAL <br /> Notes: <br /> Exterior rigid insulation <br /> BLDG 09-FIRE <br /> 12/30/2024 12/30/2024 STOPPING/BLOCKIN RAKEEB KHAN APPROVAL <br /> G <br /> Notes: <br /> 1/2/2025 1/2/2025 BLDG 12- STEVE BANKS PARTIAL eTRAKiT Inspection Request <br /> INSULATION APPROVAL <br /> Notes: <br /> 12/30/2024 1:20 PM Teshome AShikesso <br /> Contact Name:Teshome AShikesso <br /> Site Address:8900 8TH AVE W <br /> Phone:2068549329 <br /> e-Mail:teshnetll@gmail.com <br /> OK insulation in the walls R21. OK to drywall.Attic is blown in I could not verify the depth etc.as they did not have a tall ladder verify and check <br /> insulation certificate at final. <br /> 2/24/2025 2/24/2025 BLDG 16-FINAL RAKEEB KHAN CORRECTION eTRAKiT Inspection Request <br /> REQUIRED <br /> Notes: <br /> 2/21/2025 6:42 PM Teshome AShikesso <br /> Contact Name:Teshome AShikesso <br /> Site Address:8900 8TH AVE W <br /> Phone:2068540329 <br /> e-Mail:teshnetll@gmail.com <br /> Need stoppers at closet doors and handle on front of closet doors,additional brackets at handrail at ramp to support required load by code,ladder to <br /> verify insulation in attic,and all sub permit final approval prior to building final. <br /> 2/25/2025 2/25/2025 BLDG 16-FINAL RAKEEB KHAN CORRECTION eTRAKiT Inspection Request <br /> REQUIRED <br /> Notes: <br /> 2/24/2025 9:29 PM Teshome AShikesso <br /> Plumbing and Mechanical,Final <br /> Contact Name:Teshome AShikesso <br /> Site Address:8900 8TH AVE W <br /> Phone:2068540329 <br /> e-Mail:teshnetll@gmail.com <br /> rfk changed Inspection Type from BLDG 15-OTHER to BLDG 16-FINAL <br /> Need plumbing and mechanical final approval. <br /> 2/25/2025 2/25/2025 BLDG 12- RAKEEB KHAN APPROVAL <br /> INSULATION <br /> Notes: <br /> Attic insulation <br /> I <br /> Printed:Wednesday, 12 March, 2025 3 of 4 rk <br /> SUPERION <br />