Laserfiche WebLink
LEGEND <br /> A = COMPRESSED AIR <br /> 101 = BALL VALVE <br /> m = DUPLEX RIGID QUICK DISCONNECT COUPLER <br /> * = POINT OF CONNECTION <br /> 11 11 11 .25 11 .5 12 12.5 13 GENERAL NOTES <br /> 1/2"A DOWN TO 1/4" DUPLEX HARD PIPE QUICK <br /> DISCONNECTS, PARKER RF-251-8MP OR <br /> APPROVED EQUAL, WITH SHUT—OFF VALVE. QUICK <br /> DISCONNECTS MOUNTED TO FENCING AT <br /> EXIST 2" SAN UP <br /> APPROXIMATELY 4'-0" AFF. <br /> w m DN p <br /> P TABL H NO SERVICE SHALL BE INTERRUPTED OR <br /> oxae CHANGED WITHOUT WRITTEN PERMISSION FROM <br /> =71-1 <br /> 1 IR DN v 4" SAN DOWN OWNER. <br /> c� MATCH LINE 2„ V UP, 4" SAN c" 2" V UP <br /> w 9 PCTABL PCTABL 3 ALL EXISTING PIPING AND EQUIPMENT <br /> SEE DRAWING 1M116 EWC-1 1"C <br /> Y EWEWE BOP EL 116'— g ° ° 2 LOCATIONS SHOWN ARE BASED ON AVAILABLE <br /> 3 4" CW DN TO EWC & EWE ox<e aoxaa 2' <br /> N / � o INFORMATION AND FIELD OBSERVATIONS. <br /> FE <br /> P CONTRACTORS TO VERIFY LOCATIONS AND FIELD <br /> DI}Ld3 V V — CONDITIONS PRIOR TO START OF NEW WORK. <br /> C� 1/2" CW UP A A • • z <br /> O a <br /> 4", BOP EL 116'-6" 4"CW 1/2"AIR CONSTRUCTION NOTES <br /> w <br /> 3/4" CW UP TO 1/2"AIR END AND CAP 1 <br /> 2ND FLOOR SINK �4"CW 2"CW— z UPGRADED DOMESTIC WATER PIPING. <br /> AND WATER HEATE INr T U L <br /> iH <br /> ~ CWFUTUR & 3" SAN <br /> 1-1/2" V <br /> UP TO SS <br /> 01 <br /> 1 1 1/2" V DN 2" SANF M 2ND FL FLOOR DRAIN (HVAC-6) <br /> M526 M526 M526 3"SAN <br /> 1/2"AIR <br /> 1/2"AIR 2 FS-1 4"SAN <br /> 1/2"AIR WITH 2" CUR PPINGOND NLSTE FCU 1/2"HW <br /> H SEE M526 1 _ 1/2"HW <br /> 4" SAN UP <br /> 4 Wco <br /> M11 M 71M11 5 ° ° 0 1 5 <br /> ® R <br /> 1-1/2"A 7 <br /> P�4V U <br /> llllluull .. 2�4" SAN UP & DN <br /> 7 <br /> 0 0 <br /> R.1 <br /> ILI 0 <br /> REFERENCE DRAWINGS <br /> BLDG. 40-35 AIR MAI (PE PLANS) <br /> PARSCALE:1 TIAL FIRST FLOOR PEUNMBI ISHEDLDDR PEL , AN' � <br /> o LUBRICATOR — PARKER L29-08WHZ405. <br /> 1"A MOUNT NO HIGHER THAN 60" AFF. <br /> UNION (TYP.) <br /> L L <br /> SELF VENTING VALVE — APOLLO 7K-100 <br /> SERIES WITH DIXON CONICAL 1"A <br /> MUFFLER CMF28 <br /> 11 11 12 13 14 <br /> B <br /> 1/2" OD — CEJN 10-705-1403 LDG 40-35 <br /> /2" SAFETY CHECK — DIXON SCVS-4 11 <br /> � 1M110 iM11 <br /> N N.3 <br /> 1" X 1/2" REDUCER 1" CID — CEJN 10-705-1403 1M113 1411 <br /> 1" SAFETY CHECK — DIXON SCVH-8 N.7 <br /> 1/2" VALVE (NORMALLY CLOSED) 1M116 11 141111 P <br /> COMPRESSED AIR DROP m 1M1 I2 1M1 <br /> SCALE:NTS CAP I <br /> R <br /> BLDG <br /> 40-37 * PLAN NOT <br /> KEY PLAN INCLUDED IN <br /> ��'Affiliated ISSUED FOR CONSTRUCTION SCALE: NONE N THIS SET <br /> Engineers <br /> Affih&ed En9­, — 8 4 0 4 8 16 <br /> 5802 Research Park Boulevard <br /> Madison,Wisconsin 53719 <br /> Td 608.2238.2616 DESIGN BY AEI DATE 01.23.24 SCALE: 1/8"=1'-0" <br /> SYM REVISION BY APPROVED DATE SYM REMSION BY APPROVED DATE A FR1F AWN A SUBTITLE CURRENT <br /> W8861N360 SYMBOL DATE 01.23.24 <br /> �s WAS THISCDESIIGNBINDI/TOR CHECKED 2 22 1s PARTIAL FIRST FLOOR PLUMBING PLAN <br /> - RECORD DRAWING ISSUED TO OWNER - LMM LMM 01.37.94 D 787 SURGE LINE - WH SAG 03.13.13 mo-�oe �,qy FSG 12 22 16 SHEET <br /> .� co SPECIFICATION IS APPROVED ENGINEER TITLE 1 M 119 <br /> R DEMO CHEM CRIB(P14) J# 54848-64 JHB DH/FB 04.06.05 E ISSUE FOR CONSTRUCTION (WBS 16914) CBJ FSG 12.22.16 ® 5 z APPROVED BY DEPT. DATE FSG 12 22 16 737 NORTH LINE - 40-36 TOWER RELOCATIONS DP 36.01 <br /> BOE//VG CHECKED A 777 LATTICE FEEDERLINE - JM DH/FB 05,19.05 F FAMBU Tooling Deck- RECORD (WBS16336) CBJ FSG 07,20.18 '.� iaes BUILDING 40-036 <br /> ll / �k. ri',1(R��i� APPROVED JOB N0. 23722226 COMP N0. <br /> B RECORD DRAWING CLEAN-UP J 555672-04 DLR GROUP KAP 08.26.05 G DOMESTIC WATER UPGRADES- RECORD 23722226 FG DH W 01.OZ21 /ONALF•� <br /> C 787 FA&D PARTNER OFFICES J# 547411-24/25 MJP DH/F13 12.08.06 H 737 NORTH LINE-40-36 TOWER RELOCATIONS DP 36.01 W8861360 I AEI J.B.,J.P. 01.23.24 01/23/2024 APPROVED MECHANICAL MASTER COL. 11-13/P-R EVERETT, WA DWG NO. 40-037-1 M119 <br />