Laserfiche WebLink
hV IT16 Dc- 'i 6 PJ <br /> Fear i <br /> w° LtiVu R0 <br /> = F�, <br /> s p5 y,-3°° (ny PLF p I <br /> tN 2 p5 k 3" <br /> 101 P L.r- <br /> b IS n 5 F x V'-3'' M. G 4 P L.r- <br /> �f?SF x 13,a 250 VLF <br /> TRY C10x30!EA:SIDE OF <br /> EXIST WOOD BEAM <br /> p - cooPu- <br /> RpoF Take half the total load: <br /> klel <br /> 24 <br /> 5 (D) + 125 (L)+ 263 (S) PLF p Is P A_I <br /> PER ENERCALC: S 2S n S t. x i tss° LL." <br /> �}1Cfi hLF <br /> M = 34.24 K-FT(71°1©) <br /> V= 6.23K(7%) SUM : 0 t 215-0CL_) + S2U(S) PL.r <br /> b= 1.0" (L/263) <br /> Cl 2'4, W 00 rJ 6"T"ALONE (STEEL CHANNELS SHALL BE POCKET ED IN WALL <br /> OKPc <br /> K- (2eCn y Wr Et-D+D S\ApPb1Z1S FOR ADDITIONAL BEARING) <br /> K K <br /> FOUNDATION DESIGN: <br /> Assumed,Bearing Capacity= 1500 PSF <br /> Required Pad Footing Size = 12600LB/(1500PSF)=8.4 SF <br /> f .Use 3'-0"x 3'-0"x 0'-10" Deep { <br /> Footing w/(4)#4 bars each way <br /> bottom <br /> i <br /> j <br /> 1 <br /> i <br /> Description By Date (9 1Z <br /> bC—Rm DF-�b IQ Checked Date / <br /> ENGINEERING <br /> Scale Sheet No. <br /> 2S0 4th Ave.South <br /> Suite 200 Project Job No. <br /> Edmonds,WA 98020 <br /> 425.778.8500 � <br /> www.cgengineering.com 5 <br />