|
T e AIEVIITIONING ATIONS: GENERAL REFER TO ICBUILDING
<br /> IOITESIFICATIONS,REQUIREMENTS AND STANDARDS FOR EXISTING 25. ALL GYPSUM BOARD PARTITIONS SHALL BE TAPED,SPACKLED AND SANDED SMOOTH WITH NO
<br /> ACT ACOUSTICAL CEILING TILE SHELL AND CORE CONSTRUCTION.ALL WORK IS TO BE COMPATIBLE WITH EXISTING VISIBLE JOINTS TO A LEVEL 4 FINISH UNLESS OTHERWISE NOTED.PATCH AND REPAIR
<br /> AFF ABOVE FINISH FLOOR
<br /> AHJ AUTHORITIES HAVING JURISDICTION CONSTRUCTION. SURFACES TO MATCH ADJACENT OR ADJOINING SURFACES WHERE REQUIRED.ALL SURFACES
<br /> ALT. ALTERNATE SHALL BE ALIGNED. r
<br /> APPROX. APPROXIMATE 2. ALL WORK SHALL CONFORM TO APPLICABLE CURRENT FEDERAL,STATE AND LOCAL CODES. v
<br /> BD BOARD THE CONTRACTOR IS TO PROVIDE FOR ALL REQUIRED NOTIFICATION OF AND COORDINATION 26. MODIFY EXISTING SUBSTRATE AS REQUIRED TO RECEIVE NEW FLOORING MATERIALS,THUS
<br /> BLOC BUILDING WITH CITY AND STATE AGENCIES,AND PROVIDE REQUIRED PERMITS.ALL TESTS AND PREVENTING NOTICEABLE LUMPS OR DEPRESSIONS.
<br /> ELK BLOCK B INSPECTIONS ASSOCIATED WITH OBTAINING APPROVALS TO PROCEED WITH AND COMPLETE uj
<br /> BOT BLOCKING BOTTOM THE WORK SHALL BE PAID FOR BY THE CONTRACTOR. 27. ALL WORK SHALL BE ERECTED AND INSTALLED PLUMB,LEVEL,SQUARE AND TRUE.
<br /> B/S BUILDING STANDARD
<br /> BU BUILT UP 3. THE INTENT OF THE CONTRACT DOCUMENTS IS TO INCLUDE ALL LABOR AND MATERIALS, 28. REFER TO MILLWORK SHOP DRAWINGS FOR SPECIFIC DETAILS OF COORDINATION BETWEEN
<br /> CAB CABINET EQUIPMENT AND TRANSPORTATION NECESSARY OR REASONABLY INFERABLE AS BEING DRYWALLIMILLWORK CONDITIONS.
<br /> CLG CEILING NECESSARY FOR THE EXECUTION OF THE WORK.BY SUBMITTING A PROPOSAL,THE ,p
<br /> CUR CLEARANCE) CONTRACTOR REPRESENTS THAT THOROUGH EXAMINATION OF THE SITE AND ALL EXISTING 29, ALL GLASS SHALL BE CLEAR TEMPERED GLASS,UNLESS OTHERWISE NOTED.GLAZING TONG N
<br /> COL COLUMN
<br /> CO NC CONCRETE CONDITIONS AND LIMITATIO
<br /> COMPNS HAVE BEEN MADE AND THAT THE CONTRACT DOCUMENTS HAVE MARKS SHALL NOT BE VISIBLE.CLEAN AND POLISH ALL GLASS PRIOR TO PROJECT DELIVERY. Y
<br /> co CONSTRUCTION BEEN EXAMINED IN LETE DETAIL,AND THAT IT IS DETERMINED BEYOND DOUBT THAT THE
<br /> COAT CONTINUOUS DRAWINGS,SPECIFICATIONS AND EXISTING CONDITIONS ARE SUFFICIENT,ADEQUATE AND 30. ALL MILLWORK TO BE FASTENED TO THE PARTITION.PROVIDE NON-COMBUSTIBLE BLOCKING 7
<br /> CDR CORRIDOR fn
<br /> CPT CARPET SATISFACTORY FOR CONSTRUCTION OF THE WORK.WHERE MINOR ADJUSTMENTS TO THE FOR ALL MILLWORK NOT SUPPORTED BY FLOOR OR ABOVE 4'-0"HT.ALL CONCEALED LUMBERS
<br /> CT CERAMICTILE WORK ARE NECESSARY FOR THE PURPOSES OF FABRICATION AND INSTALLATION OF ITEMS,OR BLOCKING TO BE FIRE TREATED. LU
<br /> CT R CENTER RESOLUTIONS OF CONFLICTS BETWEEN ITEMS,WITHIN THE INTENT OF THE CONTRACT Z V
<br /> DEMO DEMOLITION DOCUMENTS,THE CONTRACTOR SHALL MAKE SUCH ADJUSTMENTS AT NO ADDED EXPENSE TO 31. CONTRACTOR TO PROVIDE SHOP DRAWINGS FOR:HVAC,CARPET SEAMING,LIGHTING, 7 Q
<br /> DTL DETAIL THE OWNER.WHERE SUCH MINOR ADJUSTMENTS AFFECT FUNCTIONAL OR AESTHETIC DESIGN CASEWORK. 00
<br /> DF DRINKING FOUNTAIN OF THE WORK,THEY SHALL BE SUBMITTED TO THE ARCHITECT FOR REVIEW AND APPROVAL. N P
<br /> DIA DIAMETER 32. MOISTURE TEST-REQUIRED FOR ALL ON GRADE SLAB CONDITIONS DURING THE > Q
<br /> DIM DIMENSION
<br /> DN DOWN 4. THE CONTRACTOR SHALL COORDINATE ALL OPERATIONS WITH THE OWNER,INCLUDING AREA CONSTRUCTION ESTIMATINGIBUDGETINGPRQCESS THE GENERAL CONTRACTOR SHALL BE
<br /> DR DOOR FOR WORK,MATERIALS STORAGE,AND ACCESS TO AND FROM THE WORK,SPECIAL CONDITIONS RESPONSIBLE FOR OBTAINING FROM THE BUILDING OWNER DOCUMENTATION AS TO THE VAPOR L
<br /> owe DRAWING OR NOISY WORK,TIMING OF WORK AND INTERRUPTION OF MECHANICAL AND ELECTRICAL EMISSIONS RATE(MOISTURE TEST)FOR ALL"ON GRADE SLAB CONDITIONS'.THIS INFORMATION
<br /> DRW DRAWER SERVICES.NOISY OR DISRUPTIVE WORK SHALL BE SCHEDULED AT LEAST ONE(1)WEEK IN SHOULD THEN BE IMMEDIATELY SHARED BETWEEN THE ARCHITECT,THE ARCHITECTS' >
<br /> E EAST ADVANCE OF THE TIME WORK IS TO COMMENCE. SELECTED FLOORING REPRESENTATIVE(S),AND FLOORING SUB-CONTRACTOR FOR REVIEW AND p.
<br /> EA EACH APPROVAL OF APPLICABLE MATERIALS AND ANCILLARY INSTALLATIONTINISH PRODUCTS.IF NO a)
<br /> EL ELEVATION 5. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE HIGHEST STANDARD OF MOISTURE TEST CAN BE FURNISHED OR IF FINDING ARE IN QUESTION THE GENERAL P rb
<br /> ELEC ELECTRICAL ELEV ELEVATOR WORKMANSHIP IN GENERAL AND WITH SUCH STANDARDS AS ARE SPECIFIED. CONTRACTOR SHALL PERFORM THE FOLLOWING TESTS:
<br /> EV EQUAL
<br /> EQUIP EQUIPMENT 6. CONTRACTOR SHALL ADHERE TO ALL BUILDING STANDARDS.ANY CHANGES TO SAME SHALL BE A. PROVIDE(3)CALCIUM CHLORIDE MOISTURE TESTS FOR THE FIRST THOUSAND SQUARE FEET
<br /> EST ESTIMATE SUBMITTED TO ARCHITECT IN WRITING FOR APPROVAL. AND(1)TEST FOR EVERY ONE THOUSAND SQUARE FEET THEREAFTER AT ALL FLOORS WITHIN
<br /> EXIST EXISTING
<br /> EXP EXPANSION SCOPE OF WORK.THE CALCIUM CHLORIDE TEST SHALL BE CONDUCTED IN ACCORDANCE TERRAPOWER
<br /> FEc FIRE EXTINGUISHER CABINET 7. CONTRACTOR SHALL SUBMIT SAMPLES OF ALL FINISHES OF SUCH SIZE AND NUMBER THAT THEY WITH THE LATEST EDITION OF ASTM F 1869'STANDARD TEST METHOD"FOR MEASURING
<br /> FF FACTORY FINISH REPRESENT A REASONABLE DISTRIBUTION OF COLOR RANGES AND PATTERN PRIOR TO VAPOR EMISSIONS RATE OF CONCRETE SUN-FLOOR USING ANHYDROUS CALCIUM CHLORIDE.
<br /> FFH FILL IN F NID) AND PRODUCT DATA FOR ARCHITECT'SPPROVAL ON ALL SPECIAL ITEMS REQUIRING HT INSTALLATION
<br /> DRAWINGS PROVIDE A WRITTEN REPORT OF FINDINGS TO THE ARCHITECT AS NOTED ABOVE.
<br /> ISH(E BUILDING A
<br /> FUR FLOOR FABRICATION.(SHALL INCLUDE RATED FIRE DOORS AND HARDWARE). B. PROVIDE A PH PENCIL TEST AT ALL FLOORS WITHIN SCOPE OF WORK.PROVIDE A WRITTEN FLOOR 2
<br /> FLUOR FLUORESCENT FOIC REPORT OF FINDINGS TO THE ARCHITECT AS NOTED ABOVE.
<br /> IFURNISH BY OWNER,NSTALL BVCONTRACTOR 8. CONTRACTOR IS TO VERIFY ALL DIMENSIONS AND CONDITIONS ON SITE AND NOTIFY ARCHITECT 3315 SEAWAY BLVD.
<br /> FOS FACE OFSTUD(S) OF ANY DISCREPANCIES.CONTRACTOR IS NOT TO SCALE OFF DRAWINGS. IF REQUIRED BY THE CALCIUM CHLORIDE TEST,A WATERPROOF MEMBRANE SHALL BE APPLIED EVERETT, WA 98203
<br /> FOC FACE OF CONCRETE TO ALL FLOORS WITHIN THE SCOPE OF WORK.THE WATERPROOF MEMBRANE(S)SHALL BE
<br /> FOE FACE OF FINISH 9, CONTRACTOR SHALL PROVIDE 18-GAUGE SHEET METAL BACKING IN PARTITIONS FOR ALL APPROPRIATED FOR EACH FINISH FLOORING APPLICATION AS SPECIFIED BY THE SPECIFIC
<br /> FT FOOT/FEET WALL-MOUNTED FIXTURES AND DEVICES UNLESS INDICATED OTHERWISE ON THE DRAWINGS. FLOORING MANUFACTURER VIA THE ARCHITECT.A LICENSED INSTALLER SHALL BE UTILIZED
<br /> FUR FURREoffURRING FOR INSTALLATION/APPLICATION OF EACH SPECIFIC MEMBRANE(AS APPLICABLE TO THE FINISH
<br /> GA GAUGE 10. ALL FLOORS SHOULD BE LEVEL AND NOT VARY MORE THAN 114"IN 10'-0'.THE CONTRACTOR FLOORING PRODUCT)AND A WRITTEN WARRANTY SHALL BE PROVIDED DOCUMENTING STRICT
<br /> GC GENERAL CONTRACTOR
<br /> GL G ING SHALL NOTIFY ARCHITECT OF ANY CONDITIONS THAT DO NOT MEET THIS STANDARD. CONFORMANCE TO THE SPECIFIED MANUFACTURES INSTALLATION REQUIREMENTS TO ENSURE
<br /> LAS GYPSUM WALL BOARD AND UPHOLD ALL PERFORMANCE AND LIFE CYCLE GUARANTEES.
<br /> HC HOLLOW CORE 11. ALL MATERIALS INDICATED TO MATCH EXISTING SHALL DO SO WITH RESPECT TO SIZE,SHAPE,
<br /> HCPD HANDICAPPED COLOR,TEXTURE,PATTERN,QUALITY AND METHOD OF INSTALLATION INSOFAR AS 33. CONCRETE SLAB ON GRADE REPAIR-MINOR SCOPE(100 SQUARE FEET OR LESS)
<br /> HD R HEADER PRACTICABLE AND SHALL BE APPROVED BY THE ARCHITECT BEFORE USE. DESIGN JPC
<br /> HOW R HARDWARE WHERE CONCRETE SLAB ON GRADE INFILL AND TRENCHING MUST OCCUR;CONDUCT THE
<br /> HM HOLLOW METAL 12, ALL FIREPROOFING DISTURBED DURING CONSTRUCTION SHALL BE REPLACED TO MATCH APPROPRIATE UNDER SLAB INVESTIGATION(VIA SONO-GRAPH AND/OR X-RAY TO LOCATE DRAWN TSJ
<br /> HORQ HORIZONTAL )
<br /> HR HOUR ORIGINAL FIRE PROTECTION LEVELS.(OBTAIN REQUIRED APPROVALS AND TESTING). EXISTING UTILITIES OR OTHER OBSTRUCTIONS THAT SHOULD NOT BE DAMAGED.SAW CUT SLAB CHECKED AN
<br /> HT HEIGHT AT SUBJECT AREA(S)AND PULL BACK THE EXISTING VAPOR BARRIER(IF PRESENT)AND NO. 24-0035
<br /> HVAC HEATING VENTILATING 13, THE FLOORS MAY BE OCCUPIED DURING CONSTRUCTION.THE CONTRACTOR SHALL PROTECT PROTECT FOR FUTURE RE-INSTALLATION.EXECUTE THE NECESSARY UNDER SLAB WORK
<br /> AIR CONDITIONING ALL PERSONNEL,PASSERSBY OR VISITORS TO THE SITE FROM HARM AND INJURY.BARRIERS (INCLUDING EXCAVATION),BACKFILL AND RE-COMPACT THE SUBJECT AREA WITH THE
<br /> INSUL INSULATION SHALL BE INSTALLED AS REQUIRED TO PROTECT EQUIPMENT INSTALLED DURING PREVIOUSLY HELD MATERIALS(IF THE EXCAVATED MATERIALS ARE NOT SUITABLE FOR
<br /> JAN JANITOR CONSTRUCTION. CAREFULLY MAINTAIN AND PROTECT MONUMENTS,BENCH MARKS AND THEIR RE-INSTALLATION,DISCARD AND PROVIDE NEW FREE DRAINING GRANULAR MATERIAL).
<br /> JT JOINT REFERENCE POINT FROM BEING DESTROYED OR DISTURBED;REPLACE AS REQUIRED. RE-COMPACT FILL SOIL TO AT LEAST 95%OF THE MAXIMUM DRY DENSITY(MOD)OBTAINED IN
<br /> KT KITCHEN GENERAL ACCORDANCE WITH THE ASTM D 1557 TEST PROCEDURE. RE-INSTALL THE EXISTING
<br /> LAM LAMINATED) 14. EXISTING WORK DAMAGED AS A RESULT OF WORK DONE UNDER THIS CONTRACT SHALL BE VAPOR BARRIER AND BIND SEAMS WITH MINIMUM 3"WIDE PRESSURE SENSITIVE TAPE TO
<br /> LAV LAVATORY REPAIRED TO ORIGINAL CONDITION AND FINISHED TO MATCH ADJACENT FINISHES,SUBJECT TO ENSURE AN AIR/MOISTURE RESISTANT BOND.ATTACH NEW INFILL TO EXISTING CONCRETE
<br /> LH LEFT HAND ARCHITECTS APPROVAL,AND AT NO ADDITIONAL COST TO OWNER.ALL REPLACEMENT SLAB WITH 18 INCH LONG#4 REBAR AT 24INCHES ON CENTER EMBEDDED B INCHES INTO THE
<br /> MAX MAXIMUM MATERIALS REQUIRED TO MATCH EXISTING MATERIALS SHALL DO 50 WITH RESPECT TO TYPE, EXISTING CONCRETE SLAB WITH HILTI HIT-HY-200 ADHESIVE(OR SIMPSON SET ADHESIVE).
<br /> MECH MECHANICAL PATTERN,TEXTURE,SIZE,SHAPE,COLOR AND METHOD OF INSTALLATION INSOFAR AS REINFORCEMENT SHALL BE INSTALLED PER ADHESIVE MANUFACTURER'S RECOMMENDATIONS.
<br /> MTL METAL PRACTICABLE,AND SHALL BE APPROVED BY THE ARCHITECT AND OWNER PRIOR TO PROVIDE W2 X W2 X 6 X 6 WELDED WIRE FABRIC WITHIN SUBJECT AREA(S),INFILL SLAB TO
<br /> MEZ MEZZANINE
<br /> MFR MANUFACTTURER) INSTALLATION. MATCH THICKNESS OF ADJACENT SURFACE(S)(BUT NOT BE LESS THAN FOUR INCHES THICK)
<br /> MIN MINIMUM AND#4 DOWELS SHALL BE CENTERED IN SLAB.THE CONCRETE SHALL HAVE A MINIMUM 28 DAY
<br /> MISC MISCELLANEOUS 15. ALL EXISTING MECHANICAL AND ELECTRICAL EQUIPMENT AND SERVICES DISRUPTED OR COMPRESSIVE STRENGTH OF 3000 PSI WITH A MAXIMUM WATER CEMENT RATION OF 0.58 AND IS
<br /> MTO MULLION REMOVED DURING CONSTRUCTION SHALL BE RESTORED AND REPLACED UNLESS NOTED TO BE PLACED LEVEL WITH ADJACENT SURFACES.LET CURE AND PROVIDE MOISTURE TESTING ,A\6389 REGISTERED
<br /> MILL MULLION OTHERWISE.FIREILIFE SAFETY SYSTEMS TO BE MAINTAINED DURING CONSTRUCTION. AS SPECIFIED ABOVE.
<br /> N NORTH ARCHITECT
<br /> NIC Nor IN CONTRACT 16. INSTALLATION OF MECHANICAL,ELECTRICAL AND STRUCTURAL SYSTEMS WILL REQUIRE IF SCOPE OF WORK INCLUDES STRUCTURAL ELEVATED SLABS CONSULT STRUCTURAL
<br /> NTS NOTTO SCALE
<br /> CA OVERALL OPENING OF SOME EXISTING WALLS,CEILINGS OR FLOOR CAVITIES.THE CONTRACTOR SHALL ENGINEER.REFER TO STRUCTURAL PLANS,IF APPLICABLE,FOR ADDITIONAL SPECIFICATIONS
<br /> OC ON CENTER BE RESPONSIBLE FOR THE REPAIR OF THESE OPENINGS TO MATCH EXISTING,EXCEPT WHERE AND REQUIREMENTS.
<br /> 0D OUTSIDE DIAMETER NOTED OTHERWISE.FILL ALL HOLES AND VOIDS IN FLOORS,WALLS AND CEILINGS WHICH mn
<br /> OH OPPOSITE HAND RESULT FROM INSTALLATION OF WORK,AND REMOVAL OF EXISTING MATERIALS AND 34. CLEAN,REPAIR ANY EXISTING PERIMETER BLINDS AS REQUIRED TO BE INA FULLY FUNCTIONING MARK A.PETERSoN
<br /> OPNG OPENING EQUIPMENT REQUIRED BY THIS CONTRACT. PATCHED AREAS SHALL MATCH THE MATERIALS, &OPERATIONAL MANNER.
<br /> P-LAM PlAsnc LAMINATE FINISHES,AND LEVELS ADJACENT,OR SHALL BE PUT N THE PROPER CONDITION TO RECEIVE VSTATE OF WASHINGTON
<br /> PNL PANEL THE FINISH INDICATED. 35. COORDINATE WITH SUB-CONTRACTORS THE LOCATIONS OF ELECTRICAL AND VOICEIDATA
<br /> PR PAIR OUTLETS,PLUMBING AND OTHER DEVICES WITH LAYOUT AND DESIGN OF CUSTOM CASEWORK.
<br /> PTN PARTITION 17. OPENINGS REQUIRED FOR NEW WORK THAT PENETRATES EXISTING STRUCTURE SHALL BE
<br /> RA D RADIUS COORDINATED WITH OWNER PRIOR TO COMMENCING THE WORK.ANY OPENING OVER 2"IN 36. CASEWORK SHALL CONFORM TO A.W.I.CURRENT STANDARDS.
<br /> RE RESILIENT BASE DIAMETER SHALL BE REVIEWED AND APPROVED BY OWNER.THROUGH CONCRETE SLABS OR
<br /> RT RESILIENTTILE
<br /> REF REFERENCE WALLS,OR MASONRY WALLS,ALL ROUND HOLES SHALL BE CORE DRILLED WITH A DIAMOND 37. EGRESS LIGHTING SHALL BE DESIGNED BY A LICENSED ELECTRICAL ENGINEER BASED ON FINAL
<br /> REFR REFRIGERATOR DRILL AND ALL RECTANGULAR OPENINGS SHALL BE CUT WITH A DIAMOND SAW.IN NO CASE FLOOR PLAN(S)AND THE MOST CURRENT(IN FORCE)ISSUE OF THE IBC,IEC AND LOCAL 5.10.2024 PERMIT SET
<br /> REINF REINFORCING SHALL ANY STRUCTURAL MEMBER BE CUT.USE CARBIDE-TIPPED DRILLS FOR GYPSUM CODES/ORDINANCES.THE ENGINEER MAY USE THE ARCHITECTS EGRESS MAPS(COMMON PATH
<br /> REV REQUIRED WALLBOARD PARTITIONS.KEEP OVERCUTTING TO A MINIMUM.MAINTAIN CONTINUITY AND OF TRAVEUEXIT TRAVEL DISTANCE)AS STARTING POINT FOR A BASIS OF DESIGN.HOWEVER,IT 9.17.2024 CD SET
<br /> REV REVISION
<br /> RH RIGHTHAND INTEGRITY OF FIRE SEPARATION AT ALL TIMES.GROUT AROUND CONDUITS PASSING THROUGH SHALL REMAIN THE SOLE RESPONSIBILITY OF THE ENGINEER TO COMPLETE A SCOPE OF WORK Qi l l.06.2024 TENANT REVISION
<br /> RM ROOM CONCRETE WALLS AND FLOORS AND MASONRY WALLS.MAKE PATCHES WITH NEAT,TRIMMED THAT ADDRESSES ALL EGRESS LIGHTING I.E.;ROOMS,SPECIALIZED SPACES,PATHWAYS,ETC.
<br /> RO ROUGH OPENING EDGES;MATCH ADJACENT EXISTING WORK. PER THE AFOREMENTIONED CODES.FINAL EGRESS LIGHTING QUANTITIES AND LOCATIONS
<br /> S SOUTH SHALL BE DETERMINED BY BUILDING AND FIRE INSPECTOR'S FIELD PLACEMENT
<br /> SC SOLID CORE 18. CONTRACTOR SHALL PROVIDE FLOOR LEVELING AS MAY BE REQUIRED AT SLIDING DOORS, DETERMINATION.
<br /> SEAL SEALANT RELITES WITHOUT BASE,CABINET WORK,AND OTHER LOCATIONS REQUIRING LEVEL
<br /> SECT SECTION SHT S EET SUBSTRATE.FEATHER CHANGES IN ELEVATION OVER SUFFICIENT AREA TO LIMIT TRANSITION
<br /> SIM SIMILAR SLOPE T01/8"PER FOOT.
<br /> SPEC SPECIFICATION
<br /> SO SQUARE 19, MATERIALS,ARTICLES,DEVICES AND PRODUCTS ARE SPECIFIED IN THE DOCUMENTS BY LISTING
<br /> SS STAINLESS STEEL
<br /> STL STEEL ACCEPTABLE MANUFACTURERS OR PRODUCTS,BY REQUIRING COMPLIANCE WITH REFERENCED
<br /> BTOR STORAGE STANDARDS,OR BY PERFORMANCE SPECIFICATIONS. FOR ITEMS SPECIFIED BY NAME,SELECT
<br /> STRUC STRUCTURAL ANY PRODUCT NAMED.FOR THOSE SPECIFIED BY REFERENCE STANDARDS OR BY
<br /> SUSP SUSPENDED PERFORMANCE SPECIFICATIONS SELECT ANY PRODUCT MEETING OR EXCEEDING SPECIFIED
<br /> TEL TELEPHONE CRITERIA.FOR APPROVAL OF AN ITEM NOT SPECIFIED,SUBMIT REQUIRED SUBMITTALS,
<br /> TEMP TEMPERED PROVIDING COMPLETE BACK-UP INFORMATION FOR PURPOSES OF EVALUATION.WHERE
<br /> TFTI TENANT FURNISHED BUILDING STANDARD ITEMS ARE CALLED FOR,NO SUBSTITUTE WILL BE ACCEPTED.
<br /> &TENANT INSTALLED
<br /> THK THICKNESS)
<br /> THRESH THRESHOLD 20. CONTRACTOR SHALL PROVIDE FOR ALL WORK REQUIRED TO MAINTAIN COMPLIANCE WITH
<br /> TV TELEVISION LOCAL FIRE CODE.PROVIDE FOR ALL REQUIRED SHOP DRAWINGS AND APPROVALS.
<br /> - TYP TYPICAL CONTRACTOR IS RESPONSIBLE FOR PROVIDING FIRE ALARM SYSTEM AUDIBILITY.
<br /> UNFIN UNFINISHED
<br /> a uNo UNLESS NOTED OTHERWISE 21. MECHANICAL AND ELECTRICAL FIXTURES,OUTLETS,ETC.,WHEN SHOWN ON THE
<br /> 2 VCT VINYL COMPOSITION TILE ARCHITECTURAL DRAWINGS,ARE FOR LOCATION INFORMATION ONLY.MECHANICAL AND
<br /> VEN VENEER ELECTRICAL TO BE DESIGNED BY OTHERS.ALL CIRCUITING COORDINATION TO BE BY OTHERS.
<br /> VERT VERTICAL
<br /> VESTI VESTIBULE 22. CONTRACTOR IS TO PROVIDE DRAWINGS FOR ARCHITECTS APPROVAL SHOWING LOCATIONS OF
<br /> VFY VEYL SYMBOLS LEGEND: s°""°"sT"M`
<br /> � vwc wnvL WALL covERNc ALL HVAC THERMOSTATS,GRILLES AND DIFFUSERS,FIRE AND SMOKE DETECTION DEVICES
<br /> E° w WESTANIDE INCLUDING SPRINKLERS,SMOKE DETECTORS,FIRE EXTINGUISHERS AND HOSE CABINETS,
<br /> g WI WITH PLUMBING AND PLUMBING EQUIPMENT. F-23-0-6-1 ROOM NUMBER REFERENCEWD e DETAIL REFERENCE BUBBLE GENERAL NOTES &
<br /> 3 w w 0 woo
<br /> 23. ANY CHANGE IN LIGHT FIXTURE PLACEMENT DUE TO INTERFERENCE OF MECHANICAL OR DOOR NUMBER REFERENCE I-1°a
<br /> 4Yr WEIGHT STRUCTURAL COMPONENTS MUST BE APPROVED BY THE ARCHITECT. Q3 REVISION REFERENCE
<br /> a ' JOB NORTH SYMBOLS
<br /> 24. ALL PERMITS INCLUDING FIRE,MECHANICAL,AND ELECTRICAL TO BE FILED SEPARATELY.
<br /> -ia.3 INTERIOR ELEVATION SYMBOL
<br /> © REFERENCE KEY
<br /> (REFER TO SHEETIKEYNOTES)
<br /> a 1-0. 1
<br /> 3 ©2W4 JPC ARCHITECTS,LLC
<br /> L City of Everett Permit Services
<br /> EVERETT Reviewed for Permit 01/09/2025
<br />
|