Laserfiche WebLink
TDEMOLITION RCP KEYNOTES: N O DEMOLISH EXISTING CEILING TILE AND GRID AS INDICATED.REFER TO REFLECTED <br /> CEILING PLAN FOR NEW LAYOUT.SALVAGE EXISTING ACOUSTIC TILES AND LIGHT <br /> FIXTURES FOR REUSE. <br /> O DEMOLISH EXISTING EXIT SIGN AND SALVAGE FOR RELOCATION.REFER TO <br /> REFLECTED CEILING PLAN FOR LOCATION OF NEW EXIT SIGNS. <br /> O DEMOLISH EXISTING DECORATIVE FIXTURES. 1 <br /> RCP KEYNOTES: <br /> NEW O NEW CEILING TILE AND GRID TO MATCH EXISTING GRID AND TILES.ALIGN NEW T ,p <br /> LAYOUT TO EXISTING GRID. i (=` <br /> O O O2 REFER TO HEADER DETAIL PER STRUCTURAL. Y <br /> N <br /> ° REFLECTED CEILING SHEET NOTES: W <br /> 1 <br /> z <br /> '1D '1D �p '1D O O BUILDING SYSTEMS C3 j <br /> 3 1. MODIFY EXISTING SYSTEMS AS REQUIRED BY SCOPE OF NEW WORK,THE BUILDING \ C 00 <br /> CODES IN EFFECT,AND DESIGN/CONSTRUCTION STANDARDS FOR THE SUBJECT N <br /> 0 • - BUILDING INCLUDING,BUT NOT LIMITED TO HVAC,PLUMBING,ELECTRICAL, Q Q <br /> COMMUNICATIONS,CONVEYANCE,FIREISMOKE PROTECTION,AND FIRE ALARM Z� <br /> SYSTEMS. +L+ <br /> 2. ARCHITECTURAL FEATURES AND LIGHTING LOCATIONS TAKE PRECEDENCE OVER N O1 <br /> _E OTHER ELEMENTS AND SYSTEMS.COORDINATE THE WORK OF ALL TRADES TO j <br /> ENSURE CLEARANCES FOR EQUIPMENT,FIXTURES,DUCTS,PIPING,AND ETC.AS 011� d <br /> —r--1—� 2 NECESSARY TO MAINTAIN THE FINISHED CEILING AND LIGHTING HEIGHTS AND p a)� <br /> LL LAYOUTS INDICATED IN CONSTRUCTION DOCUMENTS.NOTIFY ARCHITECT OF ANY 03 <br /> -6-� �_ _ __ CONFICTS WITH ARCHITECTURAL ELEMENTS OR LIGHTING,AND COORDINATE WITH <br /> ARCHITECT AS REQUIRED.FAILURE TO COORDINATE CONFLICTS WILL NOT WAIVE <br /> RESPONSIBILITY TO DELIVER THE FINAL DESIGN INTENT AS PRESENTED IN THE <br /> -r--1- EXIST CONSTRUCTION DOCUMENTS. <br /> -6"VI 3. VERIFY FIELD CONDITIONS AND LOCATIONS OF ALL BUILDING SYSTEMS AND <br /> COMPONENTS.INSTALL NEW AND/OR MODIFY EXISTING SYSTEMS AND COMPONENTS T E R RA P 0 W E R <br /> TO COMPLETE WORK AS REQUIRED IN THE CONSTRUCTION DOCUMENTS. <br /> 4. THE INTENT AT OPEN TO STRUCTURE CEILING AREAS IS TO KEEP THEM AS ORDERLY <br /> AS POSSIBLE,INCLUDING BUT NOT LIMITED TO HVAC,PLUMBING,CONDUIT,WIRING, BUILDING A <br /> FIRE PROTECTION AND EQUIPMENT AND FIXTURES.INSTALL OPEN TO STRUCTURE <br /> - - - - -- u ELEMENTS PARALLEL TO ADJACENT SURFACES AND FABRICATE ALL TURNS AT 90 FLOOR 2 <br /> DEGREE ANGLES.INSTALL WIRING IN LEAST VISIBLE AREAS,ADJACENT TO .I <br /> — DUCTWORK WHERE POSSIBLE. 3315 SEAWAY BLVD. <br /> - _ - - 5. SUBMIT GRILLE,THERMOSTAT,LIGHTING AND OTHER FIXTURE AND ELEMENT <br /> LAYOUTS TO THE ARCHITECT FOR REVIEW PRIOR TO ORDER PLACEMENT. EVERETT, WA 98203 <br /> 6. PROVIDE SOUND BOOTS AT ALL FULL HEIGHT ENCLOSED ROOMS AT RETURN AIR <br /> -L-J-- GRILLES,AND VAVS LOCATED IN PRIVATE OFFICES AND MEETING ROOMS. <br /> I--I ---- <br /> LIGHT FIXTURES <br /> 7. VERIFY CODE COMPLIANCE OF ALL EXISTING LIGHTING FIXTURES AND ASSOCIATED <br /> SEISMIC BRACING RESTRAINTS.FIXTURES FOUND NOT IN COMPLIANCE MAY BE <br /> REQUIRED BY THE JURISDICTION TO BE MODIFIED AND/OR REPLACED WITH <br /> EQUIVALENT FIXTURES AS REQUIRED BY CURRENT BUILDING AND/OR ENERGY <br /> CODES. <br /> 8. PROTECT EXPOSED LIGHT FIXTURES AND OTHER ELEMENTS FROM DAMAGE AND DESIGN JPC <br /> SOILING DURING CONSTRUCTION.REFER TO MANUFACTURER RECOMMENDATIONS DRAWN TSJ <br /> FOR PROTECTION DURING CONSTRUCTION. <br /> n I I n ^ 9. RE-LAMP ALL EXISTING TO REMAIN FIXTURES TO MATCH NEW FIXTURES, CHECKED AN <br /> \Y' IV LIGHTING CONTROLS NO. 24-0035 <br /> 10. ALL ENCLOSED ROOMS AND FIXTURE TYPES SHALL BE SWITCHED SEPARATELY. <br /> CONFIRM CONTROL SYSTEM CONFIGURATION WITH OWNER,TENANT AND <br /> ARCHITECT.PROVIDE ZONED LIGHTING CONTROL OF OPEN OFFICE AREAS AS <br /> SECOND FLOOR DEMOLITION REFL. CLG. PLAN REQROPRIAE.UIRED BY UBMIDE NSWITCH LOCATIONS <br /> ARCHITECTNTS FRREVAS <br /> APPROPRIATE.SUBMIT SWITCH LOCATIONS TO ARCHITECT FOR REVIEW AND <br /> _ CONFIRMATION. <br /> SCALE:1/8"=1'-0" 11. EGRESS LIGHTING SHALL BE DESIGNED BYA LICENSED ELECTRICAL ENGINEER <br /> BASED ON FINAL APPROVED LIGHTING PLANS AND THE CURRENT CODES IN EFFECT. <br /> IT SHALL REMAIN THE SOLE RESPONSIBILITY OF THE ENGINEER TO COMPLETE A <br /> SCOPE OF WORK THAT FULFILLS ALL EGRESS LIGHTING REQUIREMENTS.FINAL <br /> EGRESS LIGHTING QUANTITIES AND LOCATIONS ARE SUBJECT TO APPROVAL BY <br /> BUILDING AND FIRE INSPECTOR'S FIELD PLACEMENT DETERMINATION. <br /> CEILINGS <br /> 12. SUSPENDED CEILING COMPONENTS SHALL MATCH ADJACENT EXISTING <br /> COMPONENTS AND BE OF CONSISTENT MANUFACTURER WHERE NEW IS 6389 REGISTERED <br /> SUPPLEMENTING EXISTING.FURNISH AND INSTALL ALL ASSOCIATED TRIM AND <br /> SEIS IC BRACING AS REQUIRED. ARCHITECT <br /> 13 A. LIGHT FIXTURES,NEW SPRINKLER HEADS AND OTHER CEILING ELEMENTS SHALL BE CE <br /> CENTERED THE SECTION OF INDIVIDUAL CEILING TILES U.N.O.(EXIST. <br /> SPRINKLERSS TO REMAIN UNLESS CONFLICTING WITH NEW ELEMENTS). <br /> - - - 14. PROVIDE CEILING ACCESS AS REQUIRED FOR EQUIPMENT AND SYSTEM <br /> MAINTENANCE.PROVIDE ACCESS PANEL LOCATIONS AND PRODUCT DATA FOR <br /> ARCHITECTS REVIEW. MARK A.PETERSON <br /> ARE DIMENSIONED FOM TOP OF FINISHED <br /> O 0 15 FLOORT0 BOTTOM OFFNISHL SOFFITS AND CEILING HEIED GYPSUM BOARD ORCCEILNG TILE AND SHALL ALLOW STATE OF WASHINGTON <br /> FOR THICKNESS OF ALL FLOOR FINISHES. <br /> 16. VERIFY CODE COMPLIANCE OF EXISTING ACOUSTICAL CEILING GRID SYSTEMS AND <br /> O O O ASSOCIATED SEISMIC BRACING RESTRAINTS.SYSTEMS FOUND NOT IN COMPLIANCE <br /> --- MAYBE REQUIRED BY THE JURISDICTION TO BE MODIFIED AND/OR REPLACED WITH <br /> EQUIVALENT SYSTEMS AS REQUIRED BV CURRENT BUILDING CODES. <br /> O O <br /> 5.10.2024 PERMIT SET <br /> 0 • 1 9.17.2024 CD SET <br /> RCP SYMBOLS LEGEND: Qi ll.06.2024 TENANTREVISION <br /> TYPE SYMBOL MFG. DESCRIPTION <br /> SWITCH <br /> V'D <br /> �eI BLDG STD EXIT LIGHT <br /> GWB CEILING TYPE <br /> EXIST X'-X' CEILING HEIGHT <br /> '-6 VI �� DEMOLISH ACT GRID AND TILE <br /> rt fi <br /> BUILDING STANDARD 2x4 LIGHT <br /> ® EXTG BLDG STD SUSP. <br /> CEILING GRID&TILILE <br /> REUSED BLDG STD 2z4 CEILING <br /> TILE AND NEW GRID <br /> 1URO ON <br /> FRECESS <br /> IXTUREED LED DOWNLIGHT isoicn <br /> DEMOLITION RCP <br /> y ^ , PENDANT FIXTURE <br /> N I AND REFLECTED <br /> a CEILING PLAN <br /> �\ SECOND FLOOR REFL. CLG. PLAN NO DESIGNATION = EXIS REUSE TINGTORE <br /> R = RELOCATE FOR REUSE <br /> e N = NEW WOR RELOCATED(COORDINATE RELOCATED ITEMS I ^ <br /> W/ARCHITECT) _ .1 <br /> 3 ©2W4 JPC ARCHITECTS,LLC <br /> L City of Everett Permit Services <br /> EVERETT Reviewed for Permit 01/09/2025 <br />