My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025/06/04 Council Agenda Packet
>
Council Agenda Packets
>
2025
>
2025/06/04 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2025 8:05:13 AM
Creation date
6/5/2025 7:58:21 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/4/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
330
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
15 <br />Progressive Design Build Contract <br /> <br />vouchers, memoranda, and other data relating to the Work, all of which Design-Builder shall preserve for a <br />period of six (6) years after Final Payment. <br /> <br />Such inspection shall take place at Design-Builder’s offices during normal business hours unless another <br />location and time is agreed to by the parties. Any multipliers or markups agreed to by Owner and Design- <br />Builder as part of this Contract are only subject to audit to confirm that such multiplier or markup has been <br />charged in accordance with this Contract, but the composition of such multiplier or markup is not subject to <br />audit. <br /> <br />Article 9 <br />Termination for Convenience <br />9.1 In addition to Owner’s other termination rights in the General Conditions, Owner may terminate the <br />Contract for convenience. Upon ten (10) days’ written notice to Design-Builder, Owner may, for its <br />convenience and without cause, elect to terminate this Contract or any portion of this Contract. If such <br />termination occurs during Phase 1, then Owner shall pay Design--Builder for that portion of the Phase 1 <br />Price that corresponds to the percentage of completion of Phase 1 Work in accordance with the Contract <br />Documents, plus the reasonable administrative costs of the termination, but shall not be entitled to any <br />other costs or damages whatsoever (including without limitation fee or profit on terminated Phase 1 Work). <br />If such termination occurs during Phase 2, Owner shall (subject to the limitation set forth in Section 8.3 <br />above) pay Design--Builder for that portion of the Contract Price that corresponds to the percentage of <br />completion of Work in accordance with the Contract Documents, plus the reasonable administrative costs <br />of the termination, but shall not be entitled to any other costs or damages whatsoever (including without <br />limitation fee or profit on terminated Work). <br /> <br />9.2 The total sum to be paid to Design-Builder under this Article 9 shall not exceed the Phase 1 Price <br />for Phase 1 and the Contract Price for Phase 2, as reduced by the amount of payments otherwise made, <br />the price of Work not terminated, and as otherwise permitted by this Contract. The amounts payable to <br />Design-Builder shall exclude the fair value of property not under Owner’s control which is destroyed, lost, <br />stolen or damaged to become undeliverable to Owner. <br /> <br />9.3 Any claim, request for equitable adjustment or other demand for extra compensation or time <br />extension by Design-Builder arising from or related to acts, events, occurrences, or omissions prior to the <br />effective date of the convenience termination shall continue to be subject to and resolved in accordance <br />with the rules (contractual or legal, express or implied) in effect prior to the termination. The convenience <br />termination will not convert this Contract into a cost reimbursement contract. <br /> <br />9.4 The Parties understand and acknowledge that the Owner has the unilateral right under Section 9.1 <br />above to terminate this Contract for convenience during or at the conclusion of Phase 1 with the object of <br />having the Project completed by a 63-20 non-profit entity or similar model. Upon such termination, the <br />Parties anticipate and understand that the non-profit entity will negotiate with the Design-Builder in good <br />faith with the goal of Design-Builder and such entity entering into a Project design and/or construction <br />contract, but with both Owner and Design-Builder acknowledging that such good-faith negotiations are not <br />certain to succeed. If and when the entity and Design-Builder enter into a design and/or construction <br />contract, Owner will (1) assign Owner’s rights to the Work Product under this Contract to the entity; and (2) <br />provide such entity with all Work Product provided to Owner. If the entity and Design-Builder do not enter <br />into contract that includes Phase 1B (or equivalent), (1) Owner will pay Design-Builder $81,000 (which is <br />equal to 2.57% of the estimated fee for Phase 1B of $3,151,877); (2) Owner will assign Owner’s rights to <br />the Work Product under this Contract to the entity; and (3) Design-Builder will provide such entity with all <br />Work Product. <br />
The URL can be used to link to this page
Your browser does not support the video tag.