My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025/06/04 Council Agenda Packet
>
Council Agenda Packets
>
2025
>
2025/06/04 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2025 8:05:13 AM
Creation date
6/5/2025 7:58:21 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/4/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
330
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br /> City Council Agenda Item Cover Sheet <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Project title: Reject the bid received on March 13, 2025, for the Water Main Replacement “Y” – Phase 2 <br />project, and authorize a new call for bids. <br />Council Bill # <br /> <br />Project: Water Main Replacement “Y” – Phase 2 <br />Partner/Supplier: NA <br /> Location: I-5 bridge from East Grand Avenue to 4th Street SE <br />Preceding action: Ordinance 4038-24, approved on 8/7/24 Call for bids, approved on 3/26/25 <br />Fund: 336 - Water & Sewer System Improvements Fund <br />Agenda dates requested: <br /> <br />Briefing <br />Proposed action <br />Consent 06/04/25 <br />Action <br />Ordinance <br />Public hearing <br /> Yes X No <br /> <br />Budget amendment: <br /> Yes X No <br /> <br />PowerPoint presentation: <br /> Yes X No <br /> <br />Attachments: <br />Bid Summary <br /> <br />Department(s) involved: <br />Public Works <br /> <br />Contact person: <br />Tom Hood <br /> <br />Phone number: <br />(425) 257-8809 <br /> <br />Email: <br />thood@everettwa.gov <br /> <br />Initialed by: <br />RLS <br />Department head <br /> <br />Administration <br /> <br />Council President <br />Fiscal summary statement: <br />The total programmed available funding as authorized by Ordinance 4038-24 is $2,333,000. <br /> <br />Project summary statement: <br />Bid proposals for the Water Main Replacement “Y” – Phase 2 project were opened on May 13, <br />2025, with one (1) bid proposal received for the project from Granite Construction Company with <br />a bid of $2,659,244.81. The submitted bid significantly exceeds the engineer’s estimate of <br />$1,964,138.30. <br />To ensure responsible stewardship of resources through a competitive bid environment, the <br />department recommends we reject the sole bid and authorize a new call for bids. <br />Project will install a new water main to replace an existing water main that has experienced <br />recent breaks. The existing pipeline is suspended from I-5 bridge at the Snohomish River, making <br />access to the pipeline for repairs challenging. The upgrade will ensure reliability of water service <br />for existing customers and future development. <br /> <br />Recommendation (exact action requested of Council): <br />Reject the bid received on March 13, 2025, for the Water Main Replacement “Y” – Phase 2 <br />project, and authorize a new call for bids. <br />
The URL can be used to link to this page
Your browser does not support the video tag.