Laserfiche WebLink
<br /> <br />Attachment B <br />Specification List <br />Brown and Caldwell has provided this preliminary specification list to identify the expected design <br />specifications for the project. The specifications for the project are expected to include, but not be <br />limited to: <br /> 26 05 00: Common Work for Electrical <br /> 26 08 00: Commissioning of Electrical Systems <br /> 26 24 13: Switchboards <br /> 26 24 19: Motor Control Centers <br /> 40 61 21: Process Control System Testing